使用半直接方法模拟供水系统的峰值水需求的方法:墨西哥一住宅建筑的案例研究
Pedro Cortez-Lara1, Eva Selene Hernández Gress1, Romeo Ballinas-Gonzalez1
1Tecnologico de Monterrey, School of Engineering and Science, Ave. Eugenio Garza Sada 2501, Monterrey, N.L., 64849, Mexico.
Heliyon
|February 6, 2024
概括
在建筑物中精确计算高峰水需求至关重要. 与传统的概率方法相比,一种新的模拟方法显著降低了估计需求,降低了建筑碳足迹和健康风险.
科学领域:
- 建筑工程 建筑工程 建筑工程
- 水文学的水文学
- 环境科学 环境科学
背景情况:
- 传统的计算建筑物水需求峰值的方法依赖于概率方法.
- 这些方法由于在用水方面不可预测的人类因素导致了不准确的结果.
- 不准确的峰值需求计算导致过大供水系统,增加建筑材料,导致水停滞问题.
研究的目的:
- 介绍一个新的逐步方法来计算峰值水需求.
- 通过模拟管道固定装置的使用来解决传统方法的不准确性.
- 减少与过大水系统相关的环境影响和健康风险.
主要方法:
- 开发了一种方法来通过模拟计算峰值水需求.
- 采用了用于管道装置的标准化流量数据.
- 应用该方法来估计住宅建筑的峰值用水需求.
主要成果:
- 基于模拟的方法估计高峰水需求比传统方法低2.6倍.
- 这种新方法可以更准确地预测水系统需求.
- 确定了潜在的供水系统超大尺寸的显著减少.
结论:
- 拟议的方法提供了一个准确且易于实施的方法来计算峰值水需求.
- 这种方法可以显著减少建筑物的碳足迹,并减轻健康危害.
- 该研究强调了建筑水系统设计和未来研究的改进的一个关键领域.
相关概念视频
Design Example: Designing a Residential Plumbing System
686
The design of residential plumbing systems requires carefully evaluating water demand, flow rates, and pressure dynamics to ensure both efficiency and reliability. The nature of water flow within pipes is defined by its Reynolds number, which classifies flow as either laminar (smooth) or turbulent.
686
Single Pipe Systems
143
In pipe flow analysis, problems are typically categorized into three types — Type I, Type II, and Type III — based on the known parameters and the desired outcome. Each type of problem addresses specific engineering requirements using fluid properties, pipe characteristics, and operational conditions.
In a Type I problem, fluid properties (density and viscosity), pipe characteristics (including diameter, length, and surface roughness), and the flow rate or average velocity are...
In a Type I problem, fluid properties (density and viscosity), pipe characteristics (including diameter, length, and surface roughness), and the flow rate or average velocity are...
143
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
47
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
47
Design Example: Design of an Irrigation Channel
98
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
98
Regulation of Water Intake
506
Osmolality refers to the number of solute particles per kilogram of solvent in a solution. Plasma osmolality specifically indicates the total number of solute particles per kilogram of water in blood plasma. This value reflects the body's hydration status and is tightly regulated through mechanisms controlling water intake and output. While water consumption is a conscious decision, the body has intrinsic regulatory systems to maintain fluid balance. Dehydration, a state of water deficit...
506
Design Example: Sustainability in Concrete Building
167
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
167