泥的迁移机制和矿业中透率的降低 破碎岩石质量
Cao Zhengzheng1, Wang Pengshuai1, Li Zhenhua2,3
1International Joint Research Laboratory of Henan Province for Underground Space Development and Disaster Prevention, School of Civil Engineering, Henan Polytechnic University, Jiaozuo, 454000, Henan, China.
Scientific reports
|February 10, 2024
概括
接超负荷断裂显著降低了煤矿的透性,降低了95%以上. 这种方法有效地减轻了水和气体危险,提高了采矿安全和效率.
科学领域:
- 地质技术工程 地质技术工程
- 采矿工程 采矿工程 采矿工程
- 水文地质学 水文地质学
背景情况:
- 煤炭开采面临着来自口水和有害气体如二氧化碳的危险.
- 压超负荷断裂是安全和高效的采矿生产的关键方法.
研究的目的:
- 为了研究破碎岩石质中接的透性降低效应.
- 分析接参数与透性降低之间的关系.
- 开发一种用于接迁移和降低透性的模型.
主要方法:
- 关于接破裂岩石质量的实验研究.
- 分析气体流速,压力梯度,泄漏压力和限制压力.
- 数字模拟与接测试相结合.
主要成果:
- 透率下降了95%以上,从700-13,000mD降至15-300mD.
- 数字模拟显示透率从971.9mD减少到45.79mD (95.3%的下降).
- 较高的接压力可以提高接效果,直到一定程度.
结论:
- 接在降低岩石质量的透性和提高密封性能方面非常有效.
- 这项研究提供了岩石质量在接过程中的透性的动态进化定律.
- 接压力是煤矿有效降低透性的关键因素.
相关概念视频
Preplaced Aggregate Concrete
95
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
95
Permeability of Concrete
145
Permeability in the context of concrete refers to how easily liquids or gases can pass through the material. This quality is crucial for assessing the water-tightness and durability of concrete structures and their resistance to chemical attacks. Concrete permeability can be determined through comparative laboratory tests. These tests typically involve sealing a concrete specimen from the sides, applying water pressure to the top surface with pressure, and measuring the amount of water passing...
145
Transition Zone
92
The transition zone in concrete is a critical area where aggregate meets cement paste, marked by a distinct porosity and weakness compared to the surrounding material. The adhesion around the aggregates is primarily due to Van Der Waals forces. The voids within this zone influence its robustness; initially, it is less durable than the surrounding bulk mortar due to larger voids. Initially, when concrete is compacted, a higher water-cement ratio near the aggregates leads to the formation of...
92
Mortar Joint Deterioration in Masonry
117
Mortar joint deterioration is a significant concern in masonry structures, with water accumulation in the joints leading to damage from freeze-thaw cycles. The repeated expansion of water during freezing and its melting during thawing develop and propagate cracks in the masonry joints. Eventually, this leads to the spalling of mortar from the joints, loosening masonry units and weakening the structure. The deteriorated mortar joints are also vulnerable to moisture intrusion into the walls.
The...
The...
117
Porosity in Cement Paste
136
The porosity of concrete is a measure of the void spaces within its structure. These spaces impact its strength and durability significantly. When water and cement interact, a chemical reaction called hydration creates a semi-solid paste. This paste includes combined water, making up approximately 23% of the cement's dry mass, and gel water, which fills minuscule voids known as gel pores, accounting for about 28% of the cement gel volume.
The balance of water to cement in the mix is...
The balance of water to cement in the mix is...
136
Quarrying of Stone
113
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
113


