概括
本研究介绍了"成就程度"来管理开放式采矿边界设计中的风险. 新方法优化了基于预测的煤炭价格的边界,增加了超过51%的收入,同时控制了风险.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质工程是地质工程.
- 经济地质学 地质学
背景情况:
- 开放式采矿的边界划定对于矿山的设计和规划至关重要.
- 当前的方法通常假设固定的块参数,导致动态经济和技术条件带来的风险.
- 在不确定性下优化采矿边界面临重大挑战.
研究的目的:
- 为了在采矿边界设计中量化风险,引入"成就程度"的新概念.
- 开发一种风险控制的方法,以优化开放式采矿的边界.
- 通过整合动态参数预测来提高采矿业务的经济成果.
主要方法:
- 该研究引入了"成就程度"指标来评估边界设计风险.
- 它应用预测的煤炭价格曲线来根据特定的"成就程度"要求调整采矿边界.
- 一个理想化的小规模倾斜的煤层开采矿作为一个案例研究.
主要成果:
- 拟议的方法允许风险控制和经济上最佳的边界决定.
- 在案例研究中,边界调整紧密跟随煤炭价格的变化.
- 该方法显示,在预测期内,总收入的潜在增加约为51.15%.
结论:
- "成就程度"的概念有效地反映和管理矿山边界设计中的风险.
- 将动态价格预测集成到边界优化中可以显著提高经济回报.
- 拟议的方法为适应性和利性的露天矿山规划提供了一个强大的框架.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
47
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
47
Multimachine Stability
153
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
153
Load-frequency control
162
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
162