在挖掘面上对双墙附着环式空气窗的防尘技术进行研究
Jingxue Yan1,2, Baoshan Jia1,2, Xuerong Pan3
1College of Safety Science and Engineering, Liaoning Technical University, Fuxing, Liaoning, China.
PloS one
|March 7, 2024
概括
一个新的双墙附着环式空气窗有效控制模拟采矿环境中的尘埃. 该系统显著降低了空气中的尘埃度,提高了安全性,并改善了矿工的地下工作环境.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 环境科学 环境科学
- 流体动力学 流体动力学
背景情况:
- 在模拟的采矿环境中,尘埃迁移带来了重大的健康和安全风险.
- 现有的防尘方法需要优化以提高效率.
- 了解空气流场和气体固体双相流是减轻尘埃的关键.
研究的目的:
- 在模拟的尘土空间中研究尘埃迁移规律.
- 为了评估双壁附着环式空气窗对防尘的有效性.
- 为了最大限度地减少灰尘,优化空气的参数.
主要方法:
- 利用喷气理论和气体固体双相流理论进行分析.
- 使用控制变量方法和数值模拟软件.
- 使用真实数据进行验证,构建了一个类似的测试平台.
主要成果:
- 进风速度为30米/秒,附加的叶片角度为30°,可以实现最佳的尘埃控制.
- 对于工人来说,尘埃度保持在100mg/m3以下.
- 该系统实现了98.5%的总除尘率和97.5%的排气除尘效率.
结论:
- 双墙附着的环形空气窗创建了一个循环的空气流场,有效地屏蔽尘埃.
- 该系统可显著降低模拟地下采矿空间中的尘埃度.
- 该技术提高了矿山生产的安全性,并改善了操作人员的工作环境.
更多相关视频
09:44Laboratory Drop Towers for the Experimental Simulation of Dust-aggregate Collisions in the Early Solar System
Published on: June 5, 2014
12.8K
13:27Exploring the Effects of Atmospheric Forcings on Evaporation: Experimental Integration of the Atmospheric Boundary Layer and Shallow Subsurface
Published on: June 8, 2015
8.7K
相关概念视频
Masonry Curtain Walls
1.1K
Masonry curtain walls employ brick or stone veneers supported by the building's structure to form an external cladding system that is both aesthetically appealing and functional. These walls are erected through two principal techniques, first by traditional layering of masonry units and second by using prefabricated panels. Traditional construction relies on steel shelf angles attached to the spandrel beam for support, with high-bond mortars ensuring secure attachment of masonry veneer...
1.1K
Quarrying of Stone
113
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
113
Abrasion Resistance of Concrete
132
Abrasion resistance is an essential characteristic of concrete that determines its durability and longevity under various wear conditions. Concrete surfaces are vulnerable to different types of abrasion. For instance, surfaces may wear down due to the constant movement of vehicles or be eroded by solids carried in water, as seen in concrete canal linings. Specific tests are conducted to measure the abrasion resistance of concrete.
One such test is the revolving disc test, where three plates...
One such test is the revolving disc test, where three plates...
132
Masonry Cavity Walls
1.0K
Cavity walls feature a hollow space between the outer and inner wythes, connected only by corrosion-resistant metal ties. When water seeps through the outer wythe, it descends within this cavity, intercepted by flashing and eventually exiting through weep holes. To enhance moisture resistance, the inner wythe's cavity side often receives damp-proofing, doubling as an air barrier. The cavity can also house insulation to mitigate heat transfer.
Maintaining a clean cavity during construction...
Maintaining a clean cavity during construction...
1.0K
Preplaced Aggregate Concrete
95
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
95
Design Example: Calculating Safe Diameter for Wind-Exposed Disc
93
Assessing safety in wind-exposed installations is crucial to preventing potential failures. This example explores the calculation and design adjustments needed to mount a circular disc on a building facade, where wind forces are a primary concern. A 4-meter diameter disc was initially designed as an aesthetic feature facing winds at a velocity of 25 meters per second, with an air density of 1.25 kilograms per cubic meter. Given these conditions, the drag force on the disc was determined using...
93
