选择超大段 (SLS) 道的挖掘方法是关键. "上第一和下后"侧漂移 (SD) 方法适用于V级岩石,而顶部头部和板 (HB) 方法对III-IV级岩石有效.
科学领域:
- 地质技术工程 地质技术工程
- 道工程工程 道工程
- 土木工程 土木工程是指土木工程.
背景情况:
- 超大段 (SLS) 浅层埋地道由于其大跨度和复杂的工艺,存在重大建筑挑战.
- 挖掘方法的选择对于确保道的稳定性,成本效益和遵守施工时间表至关重要.
- 了解SLS道在不同岩石条件下的机械反应对于安全高效的施工至关重要.
研究的目的:
- 评估和比较SLS道的三种连续挖掘方法:侧向漂移 (SD),中央膜和顶部头部和长板 (HB).
- 在不同的挖掘方法和岩石等级 (III-V) 下,研究机械反应,包括岩石变形和压力.
- 确定SLS道的最佳挖掘策略,考虑安全性,成本和时间表,并通过现场测试验证.
主要方法:
- 用三维有限差异方法 (3D-FDM) 模拟来建模道的结构.
- 分析的重点是岩石变形,岩石压力和每种方法的主要支的内部力.
- 进行了现场监测和测试,以验证模拟结果并评估实际可行性.
主要成果:
- "上第一,下后"SD方法在V级岩层中证明了可行性和成本效益.
- 对于III至IV级岩石质量,HB方法被证明是合适且具有成本效益的.
- 模拟和实地测试提供了不同地质条件下每个方法性能的比较数据.
结论:
- 该研究确定了基于周围岩石等级的SLS道的最佳挖掘方法.
- 在特定的岩石条件下,建议使用"上第一和下后"SD方法和HB方法.
- 研究结果为参与SLS道建设的工程师和项目经理提供了宝贵的指导.
相关概念视频
Design Example: Maintaining Level of an Embankment
63
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
63
Quarrying of Stone
113
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
113