全面利用煤炭固体废弃物 (CSW) 的研究现状和中国采矿填充的关键技术:一篇综述

Jiqiang Zhang1, Ke Yang2, Xiang He1

  • 1Key Laboratory of Safe and Effective Coal, Mining Ministry of Education, Anhui University of Science and Technology, Huainan 232001, Anhui, China; School of Mining Engineering, Anhui University of Science and Technology, Huainan 232001, Anhui, China.

概括

基于煤炭的固体废物 (CSW) 的利用对于清洁的煤炭至关重要. 填充采矿为CSW处置提供了一种绿色,大规模的解决方案,尽管目前的成本和技术挑战.

相关概念视频

Additives and Fillers in Concrete01:29

Additives and Fillers in Concrete

Additives and fillers are integral to enhancing the properties of concrete. Pozzolans and blast-furnace slag are additives or admixtures due to their reactions with calcium hydroxide released during cement hydration. Fillers, which are finely ground and similar in fineness to Portland cement, improve concrete attributes such as workability density, and reduce capillary bleeding or cracking. Some fillers possess hydraulic properties or participate in benign reactions within the cement paste.
The...
94
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
167
Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
113