优化煤矿规划和设计,以实现可持续发展,在大量开发煤矿的情况下
Sanjay Kumar Singh1, Dheeraj Kumar2
1Department of Mining Engineering, Indian Institute of Technology (ISM), Dhanbad, India.
Heliyon
|April 11, 2024
概括
这项研究探讨了可持续的采矿实践,重点是优化煤矿规划. 它将系统工程和地理信息系统 (GIS) 整合在一起,以实现可持续的矿山生命周期发展.
科学领域:
- 环境科学 环境科学
- 采矿工程 采矿工程 采矿工程
- 系统工程 系统工程
背景情况:
- 可持续采矿整合了整个矿山生命周期的发展原则.
- 优化煤矿规划以实现可持续性是一项挑战.
- 现有的方法需要增强的方法来实现有效的整合.
研究的目的:
- 解决可持续采矿发展的条件和措施.
- 为采矿生命周期 (MLC) 的每个阶段提供解决方案.
- 强调在MLC中整合可持续发展的必要性.
主要方法:
- 利用系统工程原则来实现可持续发展目标的调整.
- 整合优化方法,以改善采矿规划.
- 通过地理信息系统 (GIS) 增强系统工程方法,用于站点分析.
主要成果:
- 确定了影响可持续性的关键社会环境和采矿工程因素.
- 证明了GIS对准确地理条件评估的实用性.
- 为可持续的煤矿开采规划提出的优化参数.
结论:
- 系统工程和GIS对于可持续的采矿规划至关重要.
- 煤炭开采系统模型的优化产生了更好的可持续性结果.
- 可持续的矿山开发需要一种标准化,优化的方法.
相关概念视频
Design Example: Sustainability in Concrete Building
167
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
167
Sustainable Development
13.3K
As the human population continues to grow and use resources, we must be mindful of our planet’s natural limits. Sustainable development provides a pathway to maintain and improve human life now while also ensuring that future generations will have the resources that they need. The long-term success of sustainability efforts rests on understanding the interplay between human actions and ecological systems.
13.3K
Design Example: Alignment of a Road Line Using GIS
48
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
48
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
46
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
46
Design Example: Managing Concrete Workability
80
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
80
Manipulation and Analysis
23
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
23


