影响道墙钻井任务执行的因素及其优先级
Peng-Fei Gao1,2, Jin-Yi Zhi3,4, Ji-Dong Hu5
1Department of Industrial Design, School of Design, Southwest Jiaotong University, Chengdu, 610031, China. Gaopengfei@swjtu.edu.cn.
Scientific reports
|April 26, 2024
概括
优化人机环境显著提高了道墙钻井任务性能 (TWDTP). 工具和物理环境是关键,而人类因素对TWDTP的影响较小.
科学领域:
- 工程 工程师 工程师 工程师
- 人类因素 人类因素
- 建设管理建设管理.
背景情况:
- 在复杂的工程中,道墙钻井任务性能 (TWDTP) 是至关重要的.
- 了解人机环境对TWDTP的影响对于优化至关重要.
研究的目的:
- 识别和分析影响TWDTP的人机环境因素.
- 确定这些因素的影响和满意度水平.
- 确定优化TWDTP的优先顺序.
主要方法:
- 问卷调查收集有关人机环境指标的数据.
- 探索性因素分析,以确定关键影响因素.
- 结构方程建模以评估因素影响和关系.
- 感知绩效与对满意度评估的重要性之间的差异分析.
主要成果:
- 工具被确定为对TWDTP影响最大的因素.
- 物理环境的质量显著影响了TWDTP.
- 人类因素对TWDTP的影响最小.
- 方便的功能维护和提高工作环境质量对于TWDTP改进至关重要.
结论:
- 优化工具和物理环境,特别是功能维护,是增强TWDTP的关键.
- 通过考虑备用工具,人员组织,人-工具匹配和安全,可以实现进一步的改进.
- 这项研究通过分析人机环境因素,为理解和优化复杂的工程任务性能提供了一个框架.
相关概念视频
Factors Affecting Workability
72
The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
72
Posttensioned Masonry Walls
145
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
145
Taping Over Different Ground Profiles
25
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
25
Design Consideration
186
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
186
Laying Concrete Masonry
94
Constructing a concrete masonry wall involves a series of steps designed to ensure durability, stability, and alignment. The construction starts with preparing the base, which includes cleaning the area where the wall will be erected. The next step involves spreading mortar where the first row of concrete blocks will be laid, typically starting at a corner section to help define the wall's boundaries.
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
94
Masonry Cavity Walls
1.0K
Cavity walls feature a hollow space between the outer and inner wythes, connected only by corrosion-resistant metal ties. When water seeps through the outer wythe, it descends within this cavity, intercepted by flashing and eventually exiting through weep holes. To enhance moisture resistance, the inner wythe's cavity side often receives damp-proofing, doubling as an air barrier. The cavity can also house insulation to mitigate heat transfer.
Maintaining a clean cavity during construction...
Maintaining a clean cavity during construction...
1.0K