根据新混合混凝土的流动特征,对道侧墙层的造多利窗口进行间距分析
Zuoqiang Chi1, Shuai Shao2, Yimin Wu2
1Shandong Luqiao Group Co., Ltd., Jinan 250014, China.
Materials (Basel, Switzerland)
|April 27, 2024
概括
通过较少的窗户倒道侧墙混凝土会降低质量. 这项研究分析了混凝土的流量,并建议倒窗的最佳间距,以提高道层的施工质量.
科学领域:
- 土木工程 土木工程是指土木工程.
- 建设管理建设管理.
- 材料科学 材料科学 材料科学
背景情况:
- 道侧墙层施工通常使用有限的倒窗来加快序列.
- 这种做法可能会损害道侧墙中混凝土倒的质量.
研究的目的:
- 分析道侧墙层的窗户倒的必要性.
- 为了研究道侧墙层灌期间的混凝土流动特性.
- 为了确定倒装窗户的最佳间距.
主要方法:
- 通过室内实验验证模拟参数和方法.
- 采用数值模拟来分析道侧墙外中的混凝土流量.
- 在各种条件下评估混凝土流动特性.
主要成果:
- 新混合混凝土的较小下降与更高的抽流速相关.
- 较短的一次性倒水距离需要车辆食窗口之间的距离较小.
- 确定了混凝土性能,倒参数和窗户间距之间的关系.
结论:
- 优化倒窗口间距对于提高道侧墙层质量至关重要.
- 该研究提供了基于工作条件的合理倒车间距离的建议.
- 调查结果支持在道建设中做出明智的决策,以提高混凝土放置效率和质量.
相关概念视频
Flow Table Test
149
The flow table test is an established method used to assess the workability of concrete, particularly useful for evaluating highly flowable concrete mixes. This test employs an apparatus that consists of a wooden board topped with a steel plate, collectively weighing 35 pounds. The board is connected to a base via a hinge and measures 27.6 inches on each side.
Concrete is placed within a truncated cone mold that is 8 inches high with an 8-inch base diameter and a 5-inch top diameter. The...
Concrete is placed within a truncated cone mold that is 8 inches high with an 8-inch base diameter and a 5-inch top diameter. The...
149
Design Example: Dimensioning of Concrete Masonry Construction
93
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
93
Mass Concreting
62
Mass concreting refers to the process of placing large volumes of concrete, such as in gravity dams. The heat generated during the cement hydration process and differential cooling rates within the concrete mass can lead to a temperature gradient, which can result in thermal cracks in the concrete mass.
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
62
Masonry Curtain Walls
1.1K
Masonry curtain walls employ brick or stone veneers supported by the building's structure to form an external cladding system that is both aesthetically appealing and functional. These walls are erected through two principal techniques, first by traditional layering of masonry units and second by using prefabricated panels. Traditional construction relies on steel shelf angles attached to the spandrel beam for support, with high-bond mortars ensuring secure attachment of masonry veneer...
1.1K
Spanning Openings in Brick Walls
186
In brick wall construction, supporting structures are crucial for openings like windows and doors to maintain the integrity and support the weight of the wall above. These supports include lintels, corbels, and arches, each serving specific structural purposes.
Lintels are primary supports used to span openings and can be crafted from materials such as reinforced concrete, steel-reinforced brick masonry, or simple steel angles. These are straightforward to install and are typically concealed...
Lintels are primary supports used to span openings and can be crafted from materials such as reinforced concrete, steel-reinforced brick masonry, or simple steel angles. These are straightforward to install and are typically concealed...
186
Cavity Drainage and Flashings in Masonry walls
79
Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
79