牙表面条件和树脂水泥固化方式对牙结合强度的影响
Sung-Ae Son1, Jae-Hoon Kim2, Deog-Gyu Seo3
1Department of Conservative Dentistry, Dental and Life Science Institute, School of Dentistry, Pusan National University, Dental Research Institute.
Dental materials journal
|May 8, 2024
概括
优化树脂水泥的结合强度需要仔细注意牙制备. 光固化粘合剂并使用5秒的干燥时间显著提高了结合强度,相比于联合固化和更长的干燥时间.
科学领域:
- 牙科材料科学 牙科材料科学
- 生物材料工程 生物材料工程
- 粘合式牙科 粘合式牙科
背景情况:
- 实现长久的树脂水泥与牙的结合对于牙科修复的长寿至关重要.
- 影响牙-树脂水泥结合强度的因素需要持续调查以优化临床方案.
研究的目的:
- 评估牙表面特征和粘合剂固化策略对树脂水泥微拉伸键强度的影响.
- 确定牙干燥时间和粘合剂固化模式的最佳条件,以提高粘合耐用性.
主要方法:
- 微拉伸键强度测试是在40颗人类牙的树脂-牙样本上进行的.
- 实验因素包括牙粗度 (240-vs. 600-grit SiC纸),空气干燥时间 (5s vs. 10s) 和粘合剂固化模式 (联合固化 vs. 单独光固化).
- 使用立体镜和共聚焦激光扫描显微镜分析了故障模式和粘合层形态.
主要成果:
- 粘合层的固化模式显著影响了粘合强度 (p<0.05),单独的光固化产生了比共固化更高的值.
- 与10秒相比,空气干燥时间缩短了5秒,从而提高了结合强度.
- 丁丁的粗度也起到了作用,尽管对其与其他因素相互作用的具体发现需要进一步详细说明.
结论:
- 建议对粘合剂进行单独的光固化和5秒的空气干燥期,以最大限度地提高树脂水泥与牙的结合强度.
- 临床方案应考虑这些变量,以提高粘合性牙科修复的成功和寿命.
相关概念视频
Curing of Concrete
94
The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
94
Bonding and Strength of Aggregate
149
The bond between aggregate particles and the cement matrix is significantly influenced by the shape and surface texture of the aggregates. High-strength concretes benefit from a rougher texture, which leads to stronger bonding due to greater adhesion. Angular aggregates with larger surface areas also enhance this bond. The bonding quality, however, is complex to assess as no universally accepted test exists. Good bonding is indicated when a crushed concrete specimen shows some aggregate...
149
Strength of Cement
133
Strength tests for cement are not performed directly on neat cement paste due to difficulty in obtaining consistent, reliable specimens. Instead, cement is typically tested in the form of cement-sand mortar.
For compressive strength tests, ASTM C 109-05 standards prescribe a cement-sand mix ratio of 1:2.75 and a water/cement ratio of 0.485 for making 2-inch cubes. These cubes are mixed, cast, and cured in saturated lime water at 23°C until testing. Flexural strength testing, outlined in...
For compressive strength tests, ASTM C 109-05 standards prescribe a cement-sand mix ratio of 1:2.75 and a water/cement ratio of 0.485 for making 2-inch cubes. These cubes are mixed, cast, and cured in saturated lime water at 23°C until testing. Flexural strength testing, outlined in...
133
Setting Time of Cement
162
The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
162
Strength and Heat of Hydration
229
The hydration of cement is an exothermic reaction in which heat is generated as cement hydrates. This heat of hydration is critical to cement's strength development. The rate at which this heat is generated affects the temperature rise, with a majority of the heat being released early in the hydration process, half within the first three days, and about 75% within the first week.
The heat of hydration for each cement compound is significant; for instance, tricalcium aluminate (C3A) and...
The heat of hydration for each cement compound is significant; for instance, tricalcium aluminate (C3A) and...
229
Curing Methods
75
Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
75


