压缩过程中的水对HMA路面表面特征的影响
Bingquan Dai1,2, Lei Mao3, Pan Pan1,2
1School of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan 430205, China.
Materials (Basel, Switzerland)
|May 11, 2024
概括
在热混合青 (HMA) 路面压缩过程中使用水会增加表面抛光的风险. 这种效应随着更高的用水量,成型温度和老化而恶化,影响了路面的耐用性.
科学领域:
- 铺路工程工程 铺路工程
- 材料科学 材料科学 材料科学
- 土木工程 土木工程是指土木工程.
背景情况:
- 在热混合青 (HMA) 路面压缩过程中通常使用水,以防止粘附.
- 这种做法可能会对青粘合剂和聚合物之间的结合产生负面影响,导致路面表面抛光.
- 这种水应用对HMA表面性能的影响需要彻底调查.
研究的目的:
- 为了确定HMA路面紧缩过程中使用的水是否会影响其表面性能.
- 量化水消耗,成型温度和老化对路面表面特征的影响.
主要方法:
- 使用黑色像素比率和质量损失比率评估HMA表面性能.
- 在不同的水耗,成型温度和长期老化的条件下进行测试.
主要成果:
- 在压缩过程中使用的水显著增加了HMA路面表面抛光的风险.
- 随着水消耗增加,成型温度提高和老化时间延长,不良影响会加剧.
- 在黑色像素比率和质量损失比率之间确定并证明了相关性.
结论:
- 在HMA压缩过程中应用水对路面表面的完整性构成风险.
- 优化水的使用和考虑温度和老化对于减轻抛光至关重要.
- 建议进行进一步的研究,以探索潜在的机制并制定有效的治疗策略.
相关概念视频
Factors Affecting Workability
72
The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
72
Design Example: Managing Concrete Workability
80
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
80
Porosity and Absorption of Aggregate
279
Aggregates contain pores of varying sizes; while some are completely enclosed within the particles, others open onto the surface, allowing water to penetrate. The porosity of aggregates is a major factor contributing to the overall porosity of concrete, given that aggregates constitute about three-quarters of concrete's volume.
When all pores in an aggregate are filled with water, the aggregate is considered saturated and surface-dry. If left in dry air, water will evaporate until the...
When all pores in an aggregate are filled with water, the aggregate is considered saturated and surface-dry. If left in dry air, water will evaporate until the...
279
Water Cement Ratio
570
The water-cement ratio is pivotal in defining concrete's quality. This ratio, a balance between the weight of water and cement in the mix, shapes the concrete's strength, durability, and resistance to environmental factors. As identified by Abrams’ law, less water in the mix equates to stronger concrete. However, water is essential not only for the chemical process of hydration but also for the concrete's workability and compaction. While hydration chemically binds water and...
570
Masonry Paving
253
The construction of masonry paving involves using materials such as bricks, stones, and concrete masonry units. These materials are chosen for their shape, color, strength, and resistance to abrasion and weathering. Masonry units can be installed dry on a thin layer of sand and a gravel base, or they can be embedded in mortar or asphalt on a concrete slab. For areas subjected to heavy vehicular loads, a rigid base layer of reinforced or unreinforced concrete is recommended. In contrast,...
253
Compacting Factor test
134
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
134