加强西班牙公共采购中的BIM实施:一个框架方法
Ana Pérez-García1, Norena Martín-Dorta1, José Ángel Aranda2
1Departamento de Técnicas y Proyectos en Ingeniería y Arquitectura, Universidad de La Laguna (ULL), Avenida Ángel Guimerá Jorge, s/n, 38204, La Laguna, (Tenerife), Spain.
Heliyon
|May 17, 2024
概括
在西班牙公共采购中采用建筑信息建模 (BIM) 面临市场成熟度挑战. 本研究提供了一个框架,以指导公共组织选择最佳的实施策略,以实现有效的BIM集成.
科学领域:
- 建设管理建设管理.
- 公共管理 公共管理
- 信息技术 信息技术 信息技术
背景情况:
- 欧盟在公共采购中促进技术,承认建筑信息建模 (BIM) 提高效率和创新.
- 在公共工程中实施BIM是欧盟成本效益的一个关键目标.
研究的目的:
- 评估西班牙公共采购中的建筑信息建模 (BIM) 实施实践.
- 识别障碍,并提出在公共部门成功采用BIM的策略.
主要方法:
- 一种混合方法的方法,结合了问卷调查和半结构化的专家访谈.
- 在公共采购中,分析整个资产生命周期的BIM采用障碍和促进因素.
主要成果:
- 市场成熟度被认为是西班牙公共采购中采用BIM的重要障碍.
- 公共组织在为BIM选择适当的实施工具时扎.
结论:
- 制定实用策略对于在西班牙的公共采购部门全面采用BIM至关重要.
- 拟议的框架有助于采购机构根据客户/部门的成熟度和招标价值选择最佳工具.
相关概念视频
Design Example: Alignment of a Road Line Using GIS
47
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47
Design Example: Sustainability in Concrete Building
167
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
167
Manufacture of Concrete Masonry Units
93
The process of manufacturing concrete masonry units begins by mixing stiff concrete composed of Portland cement, aggregates, and water. This mixture is then poured into metal molds. To ensure the concrete settles uniformly and to avoid separation of its components, the mixture in the molds is subjected to vibration. Shortly after, the still-wet blocks are removed from the molds and placed on racks.
These wet blocks are then transported for curing, which can occur in one of two environments: a...
These wet blocks are then transported for curing, which can occur in one of two environments: a...
93
Design Example: Dimensioning of Concrete Masonry Construction
93
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
93
Health Information Technology and Healthcare Information System
831
Health Information Technology (HIT)
Health Information Technology, commonly called HIT, integrates advanced information systems and technology in healthcare settings. Its primary functions include:
Health Information Technology, commonly called HIT, integrates advanced information systems and technology in healthcare settings. Its primary functions include:
831
Thematic Layering in GIS
36
In the past, planning projects such as schools or public facilities required extensive manual effort to gather and compile data. Information such as property boundaries, soil characteristics, road networks, zoning regulations, and flood zones had to be sourced individually from courthouses, utility providers, and registry offices. Assembling these datasets into a coherent format often took several months, delaying project timelines.The introduction of Geographic Information Systems (GIS)...
36