研究液压切割作为一种防止煤炭爆破灾害的方法
Mingbo Chi1,2, Haibo Tang2, Dapeng Liu3
1China Academy of Safety Science and Technology, Beijing, 100011, PR China.
Heliyon
|May 20, 2024
概括
液压切割通过减少应力度和削弱煤石质量,有效地防止煤炭爆发. 这种方法显著降低了冲击频率和冲击能量,提高了采矿安全.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 岩石机械学 岩石机械学
背景情况:
- 煤炭爆发在采矿业务中存在重大风险,原因包括残留柱和应力度等因素.
- 了解地质和应力分布特征对于减轻这些危险至关重要.
研究的目的:
- 调查液压切割的有效性,作为防止煤炭爆破的一种方法.
- 分析液压切割减轻煤层中爆破潜力的机制.
主要方法:
- 使用理论分析和数值模拟来研究液压切割.
- 现场测试是在面号进行的. 8937 在新州矿.
- 现场监测评估了液压切割对煤岩质量完整性和应力分布的影响.
主要成果:
- 液压切割减少并重新分配应力度,减少破裂潜力.
- 该方法破坏了煤石质量的完整性,释放了内部应力,并增加了含水量.
- 切割后的监测显示,破裂频率和冲击能量降低,道路收和地层位移增加.
结论:
- 液压切割是防止煤炭爆发的一个有前途的技术.
- 该方法有效地减少了煤石质量的应力积累,提高了采矿安全.
- 优化切割参数对于成功实施至关重要.
相关概念视频
Hydraulic Jump
70
A hydraulic jump is a sudden rise in fluid depth in open channels, occurring when high-velocity (supercritical) flow transitions to low-velocity (subcritical) flow. This phenomenon requires an upstream Froude number greater than 1, as flows with Fr1<1 remain subcritical, making a hydraulic jump impossible due to the need for negative head loss, which violates thermodynamic principles.The characteristics of a hydraulic jump depend on the upstream Froude number and are classified as...
70
Brick Cutting Techniques
139
Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
139
Design Example: Creating a Hydraulic Model of a Dam Spillway
159
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
159
Quarrying of Stone
110
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
110
Hydraulic Jump: Problem Solving
59
To analyze a hydraulic jump in a rectangular channel with a flow speed of 6 meters per second, follow these steps:Calculate Effective Upstream Velocity:When the downstream gate closes, a hydraulic jump forms, traveling upstream at 2 meters per second. This wave speed combines with the initial channel flow velocity, creating an effective upstream velocity.Identify Flow Velocities Before and After the Hydraulic Jump:Upstream of the hydraulic jump, the effective flow velocity includes both the...
59
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
43
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
43


