研究沟材料和管道在断层移位下相互作用的研究
Ming Yang1, Dongyuan Wang2, Haidong Jia1
1China Petroleum West Pipeline Co., Ltd., Urumqi, Xinjiang, China.
Scientific reports
|May 30, 2024
概括
泡混凝土 (FC) 为穿越活跃断层的埋藏油气管道提供了一种保护性解决方案. 这项研究证明了FC的存在.
科学领域:
- 地质技术工程 地质技术工程
- 土木工程 土木工程是指土木工程.
- 材料科学 材料科学 材料科学
背景情况:
- 大规模的管道建设面临安全挑战,特别是在复杂的地形和活跃断层附近.
- 传统的土壤填充在保护管道免受地震断层移位方面存在局限性.
- 需要新的填充材料来确保管道在地震压力下保持完整性.
研究的目的:
- 为了研究用泡混凝土 (FC) 作为填充材料的管道-土壤相互作用机制.
- 评估FC在保护穿越正常故障的埋藏管道方面的有效性.
- 为在管道沟回填充中使用FC提供参考.
主要方法:
- 对泡混凝土机械性能进行实验分析.
- 使用Abaqus进行管道-FC-土壤相互作用的有限元 (FE) 模型的开发.
- 在模拟故障移位下对管道应力和保护的定量分析.
主要成果:
- 泡混凝土具有高均性,轻量特性,可控制的强度和自我压缩特性.
- FE模型证实了FC对地震引起的正常断层位移的保护作用.
- FC为压力应力下的管道提供了比拉力应力更好的保护.
结论:
- 泡混凝土是一种可行的和保护性的补充材料,用于地震活跃区域的埋藏管道.
- 通过减轻断层运动带来的压力,FC提高了管道安全性.
- 这项研究为在关键管道基础设施项目中应用FC提供了有价值的见解.
相关概念视频
Fault Types
84
When analyzing a single line-to-ground fault from phase A to ground at a three-phase bus, it is important to consider the fault impedance. This impedance is zero for a bolted fault, equal to the arc impedance for an arcing fault, and represents the total fault impedance for a transmission-line insulator flashover. To derive sequence and phase currents, fault conditions are translated from the phase domain to the sequence domain.
For line-to-line faults occurring between phases B and C, the...
For line-to-line faults occurring between phases B and C, the...
84
Taping Over Different Ground Profiles
25
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
25
Displacement Current
2.8K
Ampère's law, in its usual form, does not work in places where the current changes with time and is not steady. Thus, Maxwell suggested including an additional contribution, called the displacement current, Id, to the real conduction current I.
2.8K
Bus Impedance Matrix
118
Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
118
Relation Between the Distributed Load and Shear
630
Understanding the relationship between the distributed load and shear force in structural analysis is crucial for analyzing beams subjected to various loading conditions. Consider the case of a beam experiencing a distributed load, two concentrated loads, and a couple moment.
630
Multiple Pipe Systems
742
Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
742