温度和资源水平对两种Odonata幼虫的物种间相互作用的影响

Lisa Stahl1, Frank Johansson1

  • 1Department of Ecology and Genetics, Animal Ecology Program Uppsala University Uppsala Sweden.

Ecology and evolution
|June 14, 2024
PubMed
概括

气候变化影响物种相互作用. 较高的温度和食物的可用性促进 (Lestes sponsa) 和 (Sympetrum vulgatum) 幼虫的生长和生存,复杂的相互作用影响社区结构.

相关概念视频

Temperature Dependence on Reaction Rate02:55

Temperature Dependence on Reaction Rate

The Collision Theory
Atoms, molecules, or ions must collide before they can react with each other. Atoms must be close together to form chemical bonds. This premise is the basis for a theory that explains many observations regarding chemical kinetics, including factors affecting reaction rates.
The collision theory is based on the postulates that (i) the reaction rate is proportional to the rate of reactant collisions, (ii) the reacting species collide in an orientation allowing contact between...
81.5K
Factors Affecting Body Temperature01:28

Factors Affecting Body Temperature

As a nurse, it is vital to understand the factors affecting body temperature to monitor variations and effectively evaluate deviations from regular.
Factors may  include:
4.1K
Responses to Heat and Cold Stress02:45

Responses to Heat and Cold Stress

Every organism has an optimum temperature range within which healthy growth and physiological functioning can occur. At the ends of this range, there will be a minimum and maximum temperature that interrupt biological processes.
13.4K
Competition02:34

Competition

When organisms require the same limited resources within an environment, they may have to compete for them. Competition is a net-negative interaction. Even if two competing individuals or populations do not interact directly, the overall fitness of both competitors is lowered as a result of not having full access to the limited resource.
21.5K
Osmoregulation in Insects01:47

Osmoregulation in Insects

Malpighian tubules are specialized structures found in the digestive systems of many arthropods, including most insects, that handle excretion and osmoregulation. The tubules are typically arranged in pairs and have a convoluted structure that increases their surface area.
16.2K