相关实验视频
Updated: Jun 23, 2025

13:48
Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
13.1K
从MSW垃圾填埋场在现场规模加速冲洗污染物,使用填充和抽取方法
Tristan Rees-White1, Richard Beaven1, John Barker1
1Faculty of Engineering and Physical Sciences, School of Engineering, University of Southampton, Building 176, Boldrewood Innovation Campus, Southampton SO16 7QF, United Kingdom.
Waste management (New York, N.Y.)
|June 22, 2024
概括
在垃圾填埋室的填充和抽取冲洗试验显示,有可能加速污染物清除和垃圾填埋场稳定. 填充和抽取周期之间的暂停提高了质量去除效率.
科学领域:
- 环境工程 环境工程
- 废物管理 废物管理
- 地质技术工程 地质技术工程
背景情况:
- 垃圾填埋场由于污染物泄漏而造成环境风险.
- 为了有效的废物管理,需要加快稳定技术.
- 填充和抽取方法是一种潜在的补救策略.
研究的目的:
- 评估填充和抽取冲洗试验用于垃圾填埋场整治的运行可行性.
- 评估污染物清除和垃圾填埋场稳定.
- 为了建模冲洗过程并优化技术.
主要方法:
- 在城市固体废物 (MSW) 填埋室进行了填充和抽取冲洗测试.
- 用化物追踪剂注射水和抽取的液.
- 对标记剂,电导率,化物和氨的分析.
- 校准了一种1D双孔模型来模拟污染物运输.
主要成果:
- 实现了63-72%的化物标记物回收.
- 估计去除了227公斤的氨和575公斤的化物.
- 模型显示适合早期数据,但后来的数据受到充电的影响.
- 证明了加速整治的潜力,但表明污染物去除效率低.
结论:
- 填充和抽取的概念显示了通过现有排水系统加速填埋场整治的希望.
- 优化该技术,特别是通过在周期之间暂停,可以增强质量去除.
- 需要进一步的研究和建模,以提高污染物清除效率.
更多相关视频
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
43
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
43
Design Example: Maintaining Level of an Embankment
61
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Conservation of Mass in Moving, Nondeforming Control Volume
1.1K
Stormwater detention basins are essential in managing runoff during heavy rainfall, particularly in urban areas where impervious surfaces increase the risk of flooding. Understanding the conservation of mass in these systems allows engineers to optimize basin performance, balancing inflow, outflow, and water storage.
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
1.1K

