铁路轨道结算模式和控制措施,用于多道建设下一个车站轨道组:一个案例研究
Pinpin Li1, Feng Lu2, Haiyun Huang1
1Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu, 610031, China.
Scientific reports
|June 24, 2024
概括
铁路轨道下的道挖掘导致了可预测的定居和流离失所. 建议使用地面加固和优化施工方法,以最大限度地减少对轨道稳定的影响.
科学领域:
- 地质技术工程 地质技术工程
- 土木工程 土木工程是指土木工程.
- 道工程工程 道工程
背景情况:
- 白石井道集团的近距离工程项目经过重庆西站轨道集团.
- 列车载荷和道和轨道之间的空间关系需要仔细研究潜在的影响.
研究的目的:
- 在挖掘过程中分析道-层层-轨道系统的沉积模式,水平移位和差异沉积.
- 为了评估轨道变形的撞击范围和时间演变.
- 为地下通道道建设提出缓解策略.
主要方法:
- 使用理论计算来建模系统的行为.
- 使用数值模拟来分析变形模式.
- 实地观察为评估定居和流离失所提供了信息.
主要成果:
- 道顶,地层和轨道沉积物表现出类似的变形模式.
- 轨道变形包括初始提升,然后是结算,最终稳定.
- 挖掘对轨道组的影响范围被确定为25-145米.
- 双轨道的差分结算在35-75米的挖掘中增加,然后稳定.
结论:
- 道挖掘对覆盖的轨道系统产生重大影响,导致可测量的定居和迁移.
- 建议将全截面孔接和表面增强接相结合用于地面增强.
- 优化施工参数 (步骤长度,支关闭) 和加固对于减轻冲击至关重要.
相关概念视频
Types of Building Separation Joints
204
Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
204
Taping Over Different Ground Profiles
25
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
25
Field Procedure for Staking Out Curves
46
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
46
Design Example: Joints in Concrete Pavements
181
Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
181
Placing Concrete
92
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
92
Design Example: Maintaining Level of an Embankment
61
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61