:

Valentyn Mohylyuk1

  • 1Leading Research Group, Faculty of Pharmacy, Riga Stradiņš University, Riga, Latvia.

概括

几何停留时间 (GDT) 是一种平板电脑制造参数. 这项研究将GDT与压缩模拟器记录的停留时间 (DTF) 进行了比较,发现DTF取决于压缩力和配方,特别是在较低的压力下.

相关概念视频

Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
151
Flow Table Test01:12

Flow Table Test

The flow table test is an established method used to assess the workability of concrete, particularly useful for evaluating highly flowable concrete mixes. This test employs an apparatus that consists of a wooden board topped with a steel plate, collectively weighing 35 pounds. The board is connected to a base via a hinge and measures 27.6 inches on each side.
Concrete is placed within a truncated cone mold that is 8 inches high with an 8-inch base diameter and a 5-inch top diameter. The...
141
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
155