状道综合征的管理:一个范围审查
Ibrahim Inzarul Haq1, Anjuli A Banerjee2, Zaki Arshad3
1Department of Trauma and Orthopaedic Surgery, University Hospitals Coventry & Warwickshire, Clifford Bridge Road, CV2 2DX, United Kingdom.
Journal of clinical orthopaedics and trauma
|August 5, 2024
概括
在大多数情况下,状道综合征的管理显示出良好的结果,但也可能出现不良结果. 确定预后因素是改善患者护理和管理后骨神经疼痛治疗期望的关键.
科学领域:
- 整形外科 整形外科 整形外科
- 神经学 神经学
- 足部医学是一门专业.
背景情况:
- 状道综合症,或后神经疼痛,是状道内的神经压缩.
- 它会影响后神经或其分支 (,侧脚,中脚).
研究的目的:
- 系统地审查和总结有关管理状道综合征的当前文献.
- 绘制有关治疗结果和预后因素的现有证据.
主要方法:
- 在PubMed,Embase,Emcare,Medline和Cinahl进行了全面的文献搜索.
- 如果这些研究报告了对状道综合征的治疗结果,那么这些研究就被纳入了研究中,经过两阶段的查过程.
主要成果:
- 包括32项研究,75.3%的病例报告出色或良好的结果.
- 在24.7%的患者中观察到公平或糟糕的结果.
- 潜在的影响因素包括年龄,症状持续时间,病因,并发症,症状严重程度和神经纤维化.
结论:
- 虽然大多数患者经历了良好的结果,但不良结果并不罕见.
- 确定了几种预后因素,但研究质量低限制了最终结论.
- 需要对预后因素进行进一步的研究,以改善临床决策和患者期望管理.
相关概念视频
Types of Surveys
Surveys are essential for marking property boundaries near water bodies. Different types of surveys are defined, each with its own function. Land surveys mark the property boundaries, while route surveys determine the position of properties on nearby highways. Topographic surveys create maps by capturing the three-dimensional features of the land. Hydrographic surveys focus on the shapes of underwater areas and the movement of streams through the properties. Mine surveys determine the relative...
Design Example: Maintaining Level of an Embankment
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Weir
A weir is a hydraulic structure designed to partially obstruct an open channel, enabling precise control and measurement of water flow. By forcing water to flow over or through it, a weir allows for accurate determination of discharge rates, making it an essential tool in water resource management. These structures are extensively used in regulating river flows, irrigation systems, and flood control channels.Types of Weirs and Their FeaturesWeirs are categorized primarily into sharp-crested and...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Manipulation and Analysis
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
Design Example: Alignment of a Road Line Using GIS
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...


