基石设计穿孔器岛的多功能性在重新表面软组织缺陷
Ranjit Kumar Sahu1, Kaushik Mahadik1, Sanjay Kumar Giri1
1Department of Burns and Plastic Surgery, All India Institute of Medical Sciences, Bhubaneswar, Odisha, India.
概括
基石设计的穿孔器岛 (KDPIF) 为各种缺陷提供了多功能重建. 这项研究表明,KDPIF的成功率很高,可以减轻疼痛,并提供出色的美学效果.
科学领域:
- 整形外科 整形外科 整形外科
- 重建性手术是一种重建性手术.
- 微手术 微手术是一种微手术.
背景情况:
- 基石设计穿孔器岛 (KDPIF) 是一种多功能本地,以其在重建中的适应性而闻名.
- 本研究评估了KDPIF在不同解剖位置和缺陷类型中的实用性.
研究的目的:
- 评估基石的多功能性,手术结果,并发症,减轻疼痛,手术时间和美学结果.
- 确定KDPIF在重建各种软组织缺陷中的有效性.
主要方法:
- 在两年内 (2021年6月至2023年6月) 进行了前性观察性研究.
- 分析了44名接受KDPIF重建软组织缺陷的患者的数据.
主要成果:
- 该研究包括44名患有不同大小和病因方面的缺陷的患者.
- 片存活率为95.45%,并发症较少 (2名患者的部分脱).
- 观察到显著的术后疼痛减轻 (83.7%) 和高患者对美学结果的满意度 (82.9%).
结论:
- 基石是整形外科医生可靠和可复制的重建选择.
- 它适用于资源有限的环境,提供良好的血管组织,并发症率低.
更多相关视频
相关概念视频
Reinforced Brick Masonry
Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
To fortify brick walls...
Types of Building Stone
Building stones, essential materials for construction, are extracted from natural rock deposits and processed into specific forms and dimensions suitable for various building applications. These stones are broadly classified into three types based on their geological formation: igneous, sedimentary, and metamorphic.
Igneous rocks are formed from the solidification of magma or lava. An example is granite, known for its durability and resistance to weathering, making it ideal for parts of...
Igneous rocks are formed from the solidification of magma or lava. An example is granite, known for its durability and resistance to weathering, making it ideal for parts of...
Quarrying of Stone
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Design Example: Distributing Reinforcements in Concrete Sections
The topic explores the practical aspects of adjusting steel reinforcements within a concrete beam section to meet specific design requirements. When designing a reinforced concrete beam, it is essential to distribute the steel reinforcements properly to ensure structural integrity and efficiency. The example provided details a scenario where a beam requires a total steel cross-section of 4 square inches. The engineer identifies that the available steel bars have a nominal diameter of 1.693...
Design Example: Managing Concrete Workability
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
To address...
Design Example: Maintaining Level of an Embankment
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...


