模拟安全对建设延误的影响:阿富汗的案例
Mohammad Basheer Ahmadzai1, Kunhui Ye1
1School of Management Science and Real Estate, Chongqing University, 83# Shabei Street, Shapingba District, Chongqing 400045, China.
Heliyon
|August 26, 2024
概括
武装人员和部落干预等安全问题大大推迟了阿富汗的建设项目. 解决这些问题需要综合风险管理和强大的安全协议,以确保项目的成功.
科学领域:
- 建设管理建设管理.
- 安全研究 安全研究
- 发展研究 发展研究 研究
背景情况:
- 冲突地区的建筑项目面临着独特的安全挑战.
- 安全问题是阿富汗预测进展的主要障碍.
- 现有的文献缺乏全面的分析与安全相关的延迟在这种情况下.
研究的目的:
- 调查安全因素与阿富汗建设延误之间的关系.
- 确定与安全相关的关键延迟因素,并评估它们对项目的时间表的影响.
- 为减轻这些延迟和增强项目弹性提供建议.
主要方法:
- 涉及建设项目的利益相关方的定量方法.
- 数据分析以识别和评估与安全相关的延迟因素的影响.
- 从客户,顾问,承包商和其他关键参与者那里收集见解.
主要成果:
- 安全问题,包括当地武装人员和部落领导人的干涉,构成重大威胁.
- 这些安全因素具有很高的严重性和频率,影响项目结果.
- 延迟因素相互关联,需要采用整体的项目管理方法.
结论:
- 安全挑战是普遍存在的,并对阿富汗的建设时间表产生重大影响.
- 考虑到利益相关者的不同观点的定制干预措施至关重要.
- 建议实施强有力的安全协议和积极的风险管理,以提高项目弹性.
相关概念视频
Effects of Creep
126
Creep in concrete, the gradual deformation under prolonged stress, significantly impacts the integrity of structures. For reinforced concrete beams, it can be a vital design consideration, as it increases deflection, sometimes necessitating additional design measures. In columns, especially slender ones under eccentric loads, creep can cause buckling, compromising their stability. However, creep can be beneficial in indeterminate structures by mitigating stresses that arise from shrinkage,...
126
Design Example: Managing Concrete Workability
76
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
76
Design Example: Maintaining Level of an Embankment
57
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
57
Design Consideration
182
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
182
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
41
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
41
Design Example: Creating a Hydraulic Model of a Dam Spillway
148
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
148