评估公私伙伴关系在高速公路的评估
1Department of Economics and Director of the Center for Competitive Government at Temple University in Philadelphia, PA, USA.
Evaluation and program planning
|August 31, 2024
概括
这项研究考察了美国公私伙伴关系 (P3) 的收费高速公路,认为用户应该为道路提供资金,以提高效率和公平性. 它强调了P3长期租的挑战,与传统的政府融资模式相反.
科学领域:
- 运输经济学 运输经济学
- 公共政策 公共政策
- 基础设施融资 基础设施融资
背景情况:
- 传统的高速公路融资依赖于联邦和州政府.
- 公私伙伴关系 (P3s) 已经成为一种替代的融资模式.
- P3s是由公共资金缺口和对私营部门效率的渴望驱动的.
研究的目的:
- 审查和评估P3模型下运营的美国四条收费公路的性能.
- 确定与P3收费高速公路项目相关的共同挑战.
- 倡导基于效率和公平的高速公路的基于用户的融资.
主要方法:
- 对四条美国P3收费高速公路的案例研究分析.
- 选择高速公路项目的绩效评估.
- 关于高速公路融资模式和P3挑战的文献审查.
主要成果:
- P3收费高速公路既带来好处,也带来重大挑战.
- 在P3高速公路协议中,长期租 (35-75年) 是很常见的.
- 基于用户的融资被提出为一个更有效和公平的模式.
结论:
- 转向P3s,虽然解决了资金需求,但引入了复杂性.
- 用户资助的高速公路为提高效率和公平提供了潜力.
- 需要进一步的研究来优化P3结构和长期租协议.
更多相关视频
11:41Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
Published on: February 1, 2020
20.3K
06:05The Participant-Reported Implementation Update and Score PRIUS: A Novel Method for Capturing Implementation-Related Data Over Time
Published on: February 19, 2021
1.3K
相关概念视频
Design Example: Alignment of a Road Line Using GIS
47
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47
Design Example: Joints in Concrete Pavements
180
Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
180
Social Traps
22.3K
Social traps are negative situations where people get caught in a direction or relationship that later proves to be unpleasant, with no easy way to back out of or avoid. The concept was orignally introduced by John Platt who applied psychology to Garrett Hardin's "Tragedy of the Commons", where in New England herd owners could let their cattle graze in the common ground. This situation seems like a good idea, but an individual could have an advantage. If they owned...
22.3K
Profile Leveling and Cross Sections
177
Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes. Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
177
Masonry Paving
251
The construction of masonry paving involves using materials such as bricks, stones, and concrete masonry units. These materials are chosen for their shape, color, strength, and resistance to abrasion and weathering. Masonry units can be installed dry on a thin layer of sand and a gravel base, or they can be embedded in mortar or asphalt on a concrete slab. For areas subjected to heavy vehicular loads, a rigid base layer of reinforced or unreinforced concrete is recommended. In contrast,...
251
Thematic Layering in GIS
35
In the past, planning projects such as schools or public facilities required extensive manual effort to gather and compile data. Information such as property boundaries, soil characteristics, road networks, zoning regulations, and flood zones had to be sourced individually from courthouses, utility providers, and registry offices. Assembling these datasets into a coherent format often took several months, delaying project timelines.The introduction of Geographic Information Systems (GIS)...
35