完善倒装:一种新的同轴技术,连续注射,以优化在圣骨造形术期间的水泥输送
Mehran Nasralla1, Afra Alfalahi1, Eef J Hendriks1
1Division of Neuroradiology, Joint Department of Medical imaging, Toronto Western Hospital, University of Toronto, Toronto, Ontario, Canada.
概括
这项研究引入了一种新的同轴神经塑造技术,用于治疗神经骨折和瘤. 这种新方法显著减少了疼痛和止痛药的使用,证明了安全有效的水泥输送方法.
科学领域:
- 干预性放射学 干预性放射学
- 整形外科手术 整形外科手术
- 在瘤学瘤学.
背景情况:
- 穿皮神经塑造术用于疼痛的圣骨骨折和瘤.
- 最佳的技术,至关重要的是,至关重要的是,至关重要的是,至关重要的是,至关重要的是,至关重要的是.
- 开发了一种新的同轴方法,以提高水泥的供应.
研究的目的:
- 为了评估一种新的同轴骨造术技术.
- 评估水泥输送和临床结果.
- 将安全性和有效性与传统方法进行比较.
主要方法:
- 追溯分析11名接受同轴神经成形手术的患者.
- 治疗缺陷骨折 (n=5) 和神圣瘤 (n=6) 的治疗方法.
- 使用双平面光镜与形光束CT导航用于穿皮接触.
主要成果:
- 所有的案例都通过同轴技术取得了技术上的成功.
- 平均注入的水泥量为20.5±6.4毫升.
- 在术后观察到疼痛显著减少 (NRS 8 至 0) 和止痛药使用 (3 至 0) (p <.01).
- 发生了两起水泥泄漏事件,没有临床后果;没有报告重大不良事件.
结论:
- 同轴顺序注射圣体塑造提供安全有效的水泥输送.
- 在高风险结构周围加强控制可能会提高安全性.
- 需要进一步的比较研究来验证与传统技术相比的结果.
相关概念视频
Pumped Concrete
1.5K
Concrete in large quantities can be pumped across long distances for placing in inaccessible sites. This system comprises a hopper that receives concrete from a mixer, a pump to propel the concrete, and pipelines that facilitate its delivery.
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
1.5K
Placing Concrete
1.7K
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
1.7K
Shotcrete
794
Shotcrete is a specialized technique where mortar or small aggregate concrete rich in cement content is sprayed onto a surface at high velocity. The force of impact compacts the material and enables it to cling to vertical or overhead areas without sagging. The technique involves layering the shotcrete in stages until it reaches approximately 4 inches in thickness. Operator skill in nozzle management is pivotal in deciding the quality of the shotcrete. Shotcrete is used in constructing tunnel...
794
Preplaced Aggregate Concrete
504
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
504
Finishing Concrete
1.4K
Concrete finishing starts immediately after the concrete has been placed and consolidated. The initial step, screeding, involves leveling the concrete surface by removing excess material to flush it with the formwork's top. Following this, bull float or darby are employed to smooth the surface further, effectively lower high spots, fill low areas, and ensure larger aggregate particles are embedded within the concrete. This preparation is critical before the appearance of bleed water, as its...
1.4K
Curing Methods
411
Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
411


