,,

Xuelian Wu1, Xiaoli Shi2, Yongjian Ke3

  • 1School of Highway, Chang'an University, Xi'an, 710064, Shaanxi, People's Republic of China.

Scientific reports
|September 19, 2024
PubMed
概括

本研究介绍了使用灰色理论测量高速公路维护性能的动态框架. 它帮助承包商更好地了解客户的需求,并有效地衡量服务水平.

相关概念视频

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
45
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
74
Toughness and Hardness of Aggregate01:22

Toughness and Hardness of Aggregate

Toughness and hardness are critical properties of aggregate materials used in concrete, particularly on pavement surfaces and industrial flooring subjected to heavy loads. Toughness is defined as the aggregate's resistance to failure by impact and is measured by the aggregate impact value (AIV). For this, the aggregate impact value test is performed, wherein the impact is delivered by a standard hammer, which falls freely under its own weight onto the aggregates. The aggregates fragment in...
248
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
54
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
24
Indeterminate Structure01:18

Indeterminate Structure

Indeterminate structures refer to structures where internal forces and reactions cannot be determined using only the equations of static equilibrium.  Indeterminate structures have more unknown forces and reaction forces than equations of static equilibrium that can be used to determine them. Indeterminate structures are often used in engineering to create complex, efficient, and aesthetically pleasing structures. There are various types of indeterminate structures used in engineering and...
509