相关实验视频
Updated: Jun 12, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.0K
一个框架来估计生态恢复的经济影响
Catherine Cullinane Thomas1,2, Christopher Huber3, Kristin E Skrabis4
1U.S. Geological Survey, Fort Collins Science Center, Fort Collins, CO, USA. catherine.cullinanethomas@usda.gov.
Environmental management
|September 26, 2024
概括
本指南提供了量化生态恢复支出对经济影响的方法. 它帮助从业者和经济学家跟踪创造就业机会和商业活动,解决恢复经济中的数据挑战.
科学领域:
- 生态恢复 生态恢复
- 环境经济学环境经济学
- 社会经济学 社会经济学
背景情况:
- 生态恢复项目增强了自然和文化资源.
- 恢复支出产生经济效益,包括创造就业机会和业务增长.
- 鉴于数据的局限性和不一致的分类系统,量化这些经济影响具有挑战性.
研究的目的:
- 为恢复从业者和项目经理提供对经济影响分析应用的清晰理解.
- 为收集项目成本数据提供一个框架,用于经济影响评估.
- 介绍建模最佳实践和恢复中经济影响分析的示例应用.
主要方法:
- 开发可访问的方法来量化恢复开支的经济影响.
- 创建一个收集和组织项目成本数据的框架.
- 应用经济建模的最佳实践与一个案例研究.
主要成果:
- 为跨学科的受众提供实用指南和工具箱.
- 解决追踪修复成本和数据不一致的挑战.
- 提供了一种系统的方法来衡量恢复的经济贡献.
结论:
- 可访问的方法和数据收集框架可以改善修复经济影响的量化.
- 需要采用标准化的方法,以始终衡量生态恢复的经济效益.
- 这项工作使实践者和经济学家能够更好地证明修复的经济价值.
相关概念视频
Ecological Disturbance
17.0K
An ecological disturbance is a temporary disruption in the environment resulting from abiotic, biotic, or anthropogenic factors, causing a pronounced change in an ecosystem. The impact of an ecological disturbance, which can depend on its intensity, frequency, and spatial distribution, plays a significant role in shaping the species diversity within the ecosystem.
17.0K
Ecological Succession
17.2K
Ecological succession is influenced by the processes of facilitation, inhibition, and toleration. Facilitation occurs when early successional species create more favorable ecological conditions for subsequent species, such as enhanced nutrient, water, or light availability. In contrast, inhibition happens when early successional species create unfavorable ecological conditions for potential successive species, such as limiting resource availability. In some cases, later successional species...
17.2K
Habitat Fragmentation
17.4K
Habitat fragmentation describes the division of a more extensive, continuous habitat into smaller, discontinuous areas. Human activities such as land conversion, as well as slower geological processes leading to changes in the physical environment, are the two leading causes of habitat fragmentation. The fragmentation process typically follows the same steps: perforation, dissection, fragmentation, shrinkage, and attrition.
17.4K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
41
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
41

