基于输电系统运营商的经济和技术目标,考虑风电场的电力系统双层扩建规划
Ran Chen1, Ali Basem2, Hayder Oleiwi Shami3,4
1School of Electronic Science and Engineering, Hunan University of Information Technology, Changsha, 410151, China.
Heliyon
|October 15, 2024
概括
本研究提出了一个双层优化框架,用于扩大发电和输电基础设施,以有效地整合风力发电场. 拟议的方法提高了输电网络的经济效率,运营性能,安全性和可靠性.
科学领域:
- 电气工程 电气工程
- 运营研究 运营研究
- 能源系统 能源系统
背景情况:
- 将风力发电场等可再生能源集成到现有电网中存在重大挑战.
- 确保输电系统的经济效率,运营性能,安全性和可靠性对于电网稳定性至关重要.
研究的目的:
- 开发和评估一个新的双层优化框架,用于规划发电和输电基础设施的扩建.
- 在考虑经济,运营,安全和可靠性目标的同时,优化风电场的整合.
主要方法:
- 采用了双层优化框架,上层处理扩展规划,下层关注网络运行.
- 该研究利用随机优化来建模负载,风力发电场和设备可用性的不确定性.
- 应用了凸线性建模和Karush-Kuhn-Tucker技术来简化复杂的优化问题.
主要成果:
- 拟议的方案有效地将运营成本,能源损耗和电压安全指数降至最低.
- 数字发现表明该计划在实现所需的经济,运营,安全和可靠性目标方面的有效性.
- 在适当的发电和传输扩张条件下,这种方法被证明特别有效.
结论:
- 开发的双层优化框架为规划电力系统扩建提供了强大的解决方案,并加强了风电场集成.
- 该研究验证了拟议方法在输电网络规划中平衡经济,运营,安全和可靠性目标的能力.
- 这项研究为系统运营商提供了有价值的工具,旨在提高可再生能源的电网性能和稳定性.
相关概念视频
Turbine-Governor Control
176
Turbine-governor control is crucial for maintaining power system stability by balancing turbine mechanical power output with electrical load demand. This mechanism ensures that generator frequency and rotor speed are within acceptable limits during load variations. Turbine-generator units store kinetic energy due to their rotating masses; this energy is released to meet the load requirement when the load increases. The electrical torque of turbines rises to meet the demand, whereas the...
176
Maximum Power Flow and Line Loadability
96
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
96
Load-frequency control
128
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
128
The Power Flow Problem and Solution
179
Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk, phase angle δk, real power Pk, and reactive power Qk. Two of these four variables are inputs, while the...
179
Control of Power Flow
255
There are several methods to control power flow in power systems:
255
Wind Turbine Machine Models
109
In the growing field of wind energy, incorporating wind turbine models into transient stability analysis is essential. Induction and synchronous machines are the primary models used, with induction machines being prevalent due to their simplicity and reliability.
Induction machines interact through the rotating magnetic field generated by the stator and the rotor. The key parameter is slip, which is the difference between synchronous speed and rotor speed relative to synchronous speed. Slip is...
Induction machines interact through the rotating magnetic field generated by the stator and the rotor. The key parameter is slip, which is the difference between synchronous speed and rotor speed relative to synchronous speed. Slip is...
109