武汉矿区第9号煤层的气体控制车道的设计,基于层布局优化
Chun Zhang1,2, Xianju Qian3,4
1College of Safety Science and Engineering, Liaoning Technical University, Fuxin, 123000, Liaoning, China.
Scientific reports
|October 27, 2024
概括
这项研究优化了9号煤层中气体控制车道的位置,以控制高气体水平. 最好的配置显著降低了气体度,确保了更安全的采矿操作.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 环境工程 环境工程
背景情况:
- 武汉矿区第9号煤层工作面上角的气体超限问题存在安全风险.
- 有效的气体控制对于安全高效的煤炭开采工作至关重要.
研究的目的:
- 为了确定9号煤层的气体控制车道的最佳配置和位置.
- 为了减轻工作面上的气体超限问题.
主要方法:
- 使用"O"圆理论和经验公式进行理论分析,以确定岩层高度范围 (沉和裂区域).
- 数字模拟用于分析不同气体控制车道位置下的气体度场.
- 现场实施和验证优化的气体控制车道设计.
主要成果:
- 覆盖的岩层高度为6.8611.26米,裂区域高度为30.1141.31米.
- 最佳的气体控制车道位置 (从返回气道20米,从煤层顶部20米) 导致气体度低 (0.35%在上角,0.26%在返回气道).
- 实现了高气体提取度 (23.7%) 和纯体积 (38.3 m3/min).
结论:
- 优化的气体控制车道配置有效地管理了 9# 煤层工作面上的气体超限问题.
- 数字模拟为现场实施提供了准确的预测.
- 该研究表明,在地下煤矿开采中,气体管理的方法取得了成功.
相关概念视频
Design Example: Managing Concrete Workability
74
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
74
Design Example: Alignment of a Road Line Using GIS
43
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
43
Quarrying of Stone
99
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
99


