概括
这项研究引入了一项新的采矿方案,用于回收在露天矿山内内部垃圾堆下埋藏的煤层. 271米的最佳采矿宽度最大化了净收入,并提高了可持续采矿的回收率.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质工程是地质工程.
- 资源管理 资源管理
背景情况:
- 在露天矿山的内部垃圾堆下埋藏的煤层构成了恢复的挑战.
- 传统研究侧重于端坡压缩,忽视了内部倾倒场景.
- 越来越多的经济剥离比率使以前无法进入的成为可行的.
研究的目的:
- 开发和评估一个新的采矿计划,用于由内部垃圾填埋所覆盖的煤层.
- 分析采矿参数与经济可行性之间的关系.
- 为了优化煤炭回收和提高整体矿山利能力.
主要方法:
- 建立煤层采矿的数学模型.
- 使用内部垃圾和非工作侧之间的沟作为工作平台.
- 分析剥离高度,工作线长度和采矿宽度的变化.
- 经济分析包括剥离成本,运输成本和净收入.
主要成果:
- 采矿净收入与采矿宽度之间的关系首先是成比例的,然后是反比例的.
- 271米的最佳采矿宽度产生了最高的净收入 (2021.4575万元).
- 生产剥离比率 (5.25) 在最佳宽度下低于经济和合理的剥离比率 (6.95).
结论:
- 拟议的采矿计划有效地解决了在内部垃圾填埋场中回收煤炭的挑战.
- 优化采矿宽度对于最大化经济效益和资源回收至关重要.
- 这种方法提高了矿山的整体利能力,并促进了安全,绿色和高效的采矿实践.
相关概念视频
Compacting Factor test
119
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
119
Slump Test
164
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
164
Aggregates Classification
305
Aggregate classification is generally based on its size, petrographic characteristics, weight, and source. Size classification ranges from coarse to fine aggregates, defined by the size of the particles. Coarse aggregates are particles that do not pass through ASTM sieve No. 4, and aggregates that pass through the sieve are fine aggregates.
Petrographic classification groups aggregates based on common mineralogical characteristics. Some of the common mineral groups found in aggregates are...
Petrographic classification groups aggregates based on common mineralogical characteristics. Some of the common mineral groups found in aggregates are...
305
Quarrying of Stone
99
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
99
Preplaced Aggregate Concrete
92
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
92
Design Example: Managing Concrete Workability
74
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
74