在加拿大阿尔伯塔省一般成年人群中,EQ-5D-5L的标准

Fatima Al Sayah1, Arafat Alam2, Hilary Short2

  • 1Alberta PROMs and EQ-5D Research and Support Unit (APERSU), School of Public Health, University of Alberta, Edmonton, AB, Canada. falsayah@ualberta.ca.

概括

本研究使用EQ-5D-5L.建立了阿尔伯塔成年人的健康状况规范. 调查结果揭示了疼痛和焦虑等常见问题,分数因年龄,性别和慢性疾病而异.

相关概念视频

Estimating Population Mean with Unknown Standard Deviation01:22

Estimating Population Mean with Unknown Standard Deviation

In practice, we rarely know the population standard deviation. In the past, when the sample size was large, this did not present a problem to statisticians. They used the sample standard deviation s as an estimate for σ and proceeded as before to calculate a confidence interval with close enough results. However, statisticians ran into problems when the sample size was small. A small sample size caused inaccuracies in the confidence interval.
William S. Gosset (1876–1937) of the...
7.6K
Estimating Population Standard Deviation01:26

Estimating Population Standard Deviation

When the population standard deviation is unknown and the sample size is large, the sample standard deviation s is commonly used as a point estimate of σ. However, it can sometimes under or overestimate the population standard deviation. To overcome this drawback, confidence intervals are determined to estimate population parameters and eliminate any calculation bias accurately. However, this only applies to random samples from normally distributed populations. Knowing the sample mean and...
3.0K
Estimating Population Mean with Known Standard Deviation01:16

Estimating Population Mean with Known Standard Deviation

To construct a confidence interval for a single unknown population mean μ, where the population standard deviation is known, we need sample mean as an estimate for μ and we need the margin of error. Here, the margin of error (EBM) is called the error bound for a population mean (abbreviated EBM). The sample mean is the point estimate of the unknown population mean μ.
The confidence interval estimate will have the form as follows:
(point estimate - error bound, point estimate +...
8.3K