关于水力压裂部分和空白部分之间岩石爆破的预防和控制影响的比较研究
Shuo Yang1, Jiang Bian1,2, Aixin Liu1,2
1School of Mines, China University of Mining and Technology, Xuzhou 221116, China.
Sensors (Basel, Switzerland)
|November 27, 2024
概括
煤矿中的水力压裂可以防止岩石爆裂. 留下三角形空白段可以降低成本而不会降低效率,而常规空白段提供比无断裂更好的保护,但低于断裂段.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 岩石机械学 岩石机械学
背景情况:
- 煤矿岩石爆炸带来了重大的安全风险.
- 液压压裂是硬屋顶层控制的关键技术.
- 现有的关于用于防止岩石爆裂的液压压裂的研究缺乏对空白段的关注.
研究的目的:
- 定义和分析三角形和正规空白段在定向长孔分阶段液压压裂.
- 为了比较破碎和空白部分的岩石爆破预防和控制效果.
- 为优化液压压裂钻孔设计提供见解.
主要方法:
- 使用了地下-地面集成微地震监测技术.
- 采用过渡电磁检测技术.
- 分析了微地震能量,频率和在线压力监测数据.
主要成果:
- 三角形空白段可以降低施工成本,而不会影响岩石破裂的预防.
- 常规空白段显示出优越的岩石爆裂控制与非破裂区域相比.
- 常规空白段的效果比完全破裂的段要低.
结论:
- 优化钻孔设计以最大限度地覆盖常规空白部分至关重要.
- 三角形空白段为岩石爆破控制提供了具有成本效益的解决方案.
- 该研究为平衡岩石爆破预防和压裂设计中的经济成本提供了有价值的参考.
相关概念视频
Microcracking in Concrete
103
Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
103
Abrasion Resistance of Concrete
106
Abrasion resistance is an essential characteristic of concrete that determines its durability and longevity under various wear conditions. Concrete surfaces are vulnerable to different types of abrasion. For instance, surfaces may wear down due to the constant movement of vehicles or be eroded by solids carried in water, as seen in concrete canal linings. Specific tests are conducted to measure the abrasion resistance of concrete.
One such test is the revolving disc test, where three plates...
One such test is the revolving disc test, where three plates...
106
Behavior of Concrete Under Compressive Load
148
Concrete exhibits specific behaviors under different compressive loads. Understanding this is crucial for understanding its structural integrity. When concrete undergoes uniaxial compression, it tends to develop cracks that run parallel to the direction of the force. These parallel cracks stem from localized tensile stresses that occur perpendicular to the compression direction. Additionally, angled cracks may appear due to the formation of shear planes.
As the concrete specimen fractures under...
As the concrete specimen fractures under...
148
Effects of Air-entrainment in Concrete
80
Air entrainment in concrete significantly enhances the material's durability, especially in environments subjected to freeze-thaw cycles. Introducing small air bubbles into the concrete mix acts as internal voids that accommodate the expansion of water when it freezes, thereby alleviating internal stress and preventing structural cracks. This function is crucial in climates with significant freezing and thawing, as it protects the concrete from repeated stresses that could lead to premature...
80
Preplaced Aggregate Concrete
92
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
92
Quarrying of Stone
99
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
99


