埋葬聚乙烯天然气管道的定位方法 基于声信号圆方法
Hanyu Zhang1, Yang Li1, Zhuo Xu1
1School of Mechanical Engineering, Northeast Electric Power University, Jilin 132011, China.
Sensors (Basel, Switzerland)
|November 27, 2024
概括
这项研究引入了一种新的方法,可以使用声信号分析和圆方程准确地定位埋藏的聚乙烯 (PE) 气管道. 该技术提高了管道深度定位的准确性,为基础设施监控提供了实用解决方案.
科学领域:
- 地质物理学 地质物理学
- 声学信号处理 声学信号处理
- 土木工程 土木工程是指土木工程.
背景情况:
- 埋藏管道的准确定位对于安全和维护至关重要.
- 管道深度定位的现有方法存在局限性.
研究的目的:
- 提出和验证一种用于埋藏PE气管深度定位的新方法.
- 为了提高准确性,将声信号分析与圆方程结合起来.
主要方法:
- 使用双树复杂波量变换去除声信号.
- 通过交叉相关函数提取信号延迟时间.
- 使用圆方程计算管道深度.
主要成果:
- 模拟错误控制在5%以内.
- 实验错误控制在10%以内.
- 诸如埋葬深度,传感器位置和激发频率等因素显著影响定位.
结论:
- 拟议的圆方法有效地确定埋藏的PE管道深度.
- 该方法为实际的管道定位提供了可行和准确的解决方案.
- 这项研究为未来的管道监控技术提供了宝贵的参考.
相关概念视频
Design Example: Measuring Distance Between Two Points with Obstructions
28
When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
28
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device
22
Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
22
Electronic Distance Measuring Instruments
27
Electronic Distance Measuring Instruments (EDMs) are essential tools in modern surveying, offering precise distance measurements by emitting electromagnetic signals and calculating the time required for these signals to travel to a target and return. Two primary types of signals are used in EDMs — light waves and microwaves — each suited to specific environmental and distance requirements. Light-wave-based EDMs utilize either infrared or laser light, providing high accuracy over short...
27
Design Example: Alignment of a Road Line Using GIS
41
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
41
Plane Potential Flows
369
Plane potential flows simplify fluid motion by assuming the fluid to be irrotational and incompressible. These characteristics allow these flows to be described by a velocity potential function, ϕ, representing the flow speed in a given direction, and a stream function, ψ, that visualizes the flow path, both governed by Laplace's equation. These parameters help in estimating flow patterns, velocity distributions, and pressure fields around various hydraulic structures.
Uniform...
Uniform...
369
Area Computation by the Alternative Coordinate Method
46
The alternative coordinate method, also known as the Shoelace Formula, is a technique for determining the area of a traverse using Cartesian coordinates. This method relies on the sequential arrangement of x and y coordinates for each point of the shape, ensuring accuracy and ease of application.In this approach, each corner's x and y coordinates are listed as fractions, with the x-coordinate as the numerator and the y-coordinate as the denominator. These coordinates are arranged sequentially...
46


