基于动态综合分析方法的goaf废岩填充物的稳定性研究
Gongyong Wu1, Xingxin Nie1, Linhai Zhao2
1Xi'an University of Architecture and Technology, Xi'an, 710055, China.
Heliyon
|December 25, 2024
概括
结合废石填充和水泥屋顶填充,有效地稳定了地下采矿空洞. 这种方法降低了岩石应力,提高了岩层稳定性,并最大限度地减少了表面变形,从而促进了环境可持续的采矿实践.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 环境科学 环境科学
背景情况:
- 地下空洞处理对于可持续采矿至关重要.
- 现有的方法在确保安全性和稳定性方面面临挑战.
- 环境可持续的矿山建设需要有效的空洞管理.
研究的目的:
- 评估废弃岩石填充和用于采矿空洞的水泥屋顶填充的综合方法.
- 分析这些处理对岩石应力,应变和表面稳定性的影响.
- 提供有关绿色采矿和空洞处理策略的见解.
主要方法:
- 综合数值模拟分析.
- 在现场监测流离失所情况.
- 在空洞形成和处理过程中,动态分析压力-应变条件.
主要成果:
- 结合的"废岩填充 + 混凝土屋顶填充"有效地减少了周围岩石的应力,并提高了高夫的稳定性.
- 表面的移位和变形显著减少,确保了表面河床的稳定性.
- 应力和应变敏感点主要位于顶部,底部和间.
结论:
- "废石填充+水泥屋顶填充"方法提高了采矿空隙的稳定性,并促进了绿色矿山建设.
- 这种方法有效地将固体废物转化为矿山内有价值的资源.
- 该研究为类似复杂的地下空洞处理挑战提供了可行的解决方案.
关键词:
绿色矿山是绿色的矿山.米达斯GTS/NXMidas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas Midas GTS/NXMidas GTS/NXMidas GTS/NXMidas Midas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXMidas GTS/NXM稳定的稳定性 稳定的稳定性地下矿山 Goaf 地下矿山 Goaf垃圾岩石填充 填充 垃圾岩石填充更多相关视频
相关概念视频
Design Example: Maintaining Level of an Embankment
34
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
34
Unsoundness of Aggregate due to Volume Change
84
Unsoundness in aggregates due to volume changes is primarily caused by the physical alterations aggregates undergo, such as freezing and thawing, thermal changes, and wetting and drying. Unsound aggregates, when subjected to these changes, result in volume change upon disintegration. This, in turn, contributes to the deterioration of concrete, including scaling, pop-outs, and cracking. Particular types of aggregates, such as porous flints, cherts, and those containing clay minerals, are...
84
Dynamic Modulus of Elasticity of Concrete
209
The dynamic modulus of elasticity assesses how a concrete structure deforms under impact or dynamic loads. It is typically higher than the static modulus of elasticity, measured under slow, steady loading conditions.
The sonic test is a common method to determine the dynamic modulus. In this test, a concrete beam, sized either 6 x 6 x 30 inches or 4 x 4 x 20 inches, is clamped at its center. Vibrations are initiated at one end of the beam by an electromagnetic exciter unit powered by...
The sonic test is a common method to determine the dynamic modulus. In this test, a concrete beam, sized either 6 x 6 x 30 inches or 4 x 4 x 20 inches, is clamped at its center. Vibrations are initiated at one end of the beam by an electromagnetic exciter unit powered by...
209
Design Consideration
163
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
163
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
26
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
26
Design Example: Managing Concrete Workability
63
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
63


