埃塞俄比亚奥罗米亚省北谢瓦区博瓦达约尔大站点的工程地质评估,埃塞俄比亚
Ashu Fekadu1, Yadeta C Chemeda1, Shankar Karuppannan1,2
1Department of Applied Geology, College of Applied Natural Science, Adama Science and Technology University, Adama, P.O. Box: 1888, Ethiopia.
Heliyon
|January 16, 2025
概括
埃塞俄比亚的工程地质评估发现,博瓦大约尔大面临的挑战是由于基岩和软岩的破裂. 适当的基础设计可以减轻定居风险,并确保水安全.
科学领域:
- 地质技术工程 地质技术工程
- 工程地质工程地质学
- 水文地质学 水文地质学
背景情况:
- 包括埃塞俄比亚在内的发展中国家面临着严重的粮食和水资源不安全,而干旱等气候事件加剧了这一现象.
- 博瓦·戴奥尔石重力大项目旨在改善农业灌和缓解水资源短缺问题.
- 复杂的地质条件,包括破碎的玄武岩和薄弱的岩,对大的基础构成工程挑战.
研究的目的:
- 对博瓦·达约尔水站点和水库进行全面的工程地质评估.
- 评估现有岩石和土壤单位的基础适用性.
- 识别和提出潜在地质风险的缓解策略.
主要方法:
- 地质绘图和不连续性测量以表征现场地质.
- 核心钻探和实验室测试 (点负载指数测试,岩石质量指定) 以确定岩石质量属性.
- 在现场进行透性测试 (打包器测试),以评估地下水流动特征.
主要成果:
- 识别的石质单元包括流/流沉积物,阿法尼特基岩岩和岩,呈现不同程度的气候变化和断裂.
- 岩石强度差异很大,不受限制的压力强度从0.16 MPa到146.88 MPa不等.
- 液压导电性 (Lu < 1) 表明过度泄漏的风险最小,而允许承载能力在玄武岩 (0.5418.86 MPa) 和陶 (0.0370.11 MPa) 之间存在显著差异.
结论:
- 岩单元具有较低的承载能力,可能导致差异化结算.
- 即使是通过合格的阿法尼特基岩岩石和坚固的基础建设来分配负载,对于缓解定居点至关重要.
- 该研究提供了对博瓦·达约尔大安全有效的设计和施工的基本数据.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
40
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
40
Design Example: Creating a Hydraulic Model of a Dam Spillway
121
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
121
Design Example: Maintaining Level of an Embankment
51
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
51
Design Example: Managing Concrete Workability
71
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
71
Weir
35
A weir is a hydraulic structure designed to partially obstruct an open channel, enabling precise control and measurement of water flow. By forcing water to flow over or through it, a weir allows for accurate determination of discharge rates, making it an essential tool in water resource management. These structures are extensively used in regulating river flows, irrigation systems, and flood control channels.Types of Weirs and Their FeaturesWeirs are categorized primarily into sharp-crested and...
35
Weir: Problem Solving
39
Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...
39