埃塞俄比亚奥罗米亚省北谢瓦区博瓦达约尔大站点的工程地质评估,埃塞俄比亚

Ashu Fekadu1, Yadeta C Chemeda1, Shankar Karuppannan1,2

  • 1Department of Applied Geology, College of Applied Natural Science, Adama Science and Technology University, Adama, P.O. Box: 1888, Ethiopia.

Heliyon
|January 16, 2025
PubMed
概括

埃塞俄比亚的工程地质评估发现,博瓦大约尔大面临的挑战是由于基岩和软岩的破裂. 适当的基础设计可以减轻定居风险,并确保水安全.

相关概念视频

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
40
Design Example: Creating a Hydraulic Model of a Dam Spillway01:21

Design Example: Creating a Hydraulic Model of a Dam Spillway

Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
121
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
51
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
71
Weir01:24

Weir

A weir is a hydraulic structure designed to partially obstruct an open channel, enabling precise control and measurement of water flow. By forcing water to flow over or through it, a weir allows for accurate determination of discharge rates, making it an essential tool in water resource management. These structures are extensively used in regulating river flows, irrigation systems, and flood control channels.Types of Weirs and Their FeaturesWeirs are categorized primarily into sharp-crested and...
35
Weir: Problem Solving01:26

Weir: Problem Solving

Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...
39