相关实验视频
Updated: May 31, 2025

06:54
Ultrasonic Fatigue Testing in the Tension-Compression Mode
Published on: March 7, 2018
10.6K
研究干技术在超声波非破坏性测试混凝土的干技术
1College of Mechanical & Electrical Engineering, Central South University, Changsha 410083, China.
Micromachines
|January 25, 2025
概括
这项研究引入了一种用于混凝土检查的新型点接触干超声波传感器. 这项创新提高了混凝土结构的非破坏性测试 (NDT) 中的信号采集和准确性.
科学领域:
- 土木工程 土木工程是指土木工程.
- 材料科学 材料科学 材料科学
- 非破坏性测试是指非破坏性测试.
背景情况:
- 超声波非破坏性测试 (NDT) 对于混凝土结构健康监测至关重要.
- 由于合不良,传统方法在不规则的表面上遭受能量损失和信号衰减.
- 这限制了混凝土检查的准确性和可靠性.
研究的目的:
- 提出一个点接触干超声波传感器解决方案.
- 为了在没有合器的混凝土中实现高效的超声波信号采集.
- 为了提高混凝土超声波成像的方便性和信号噪声比 (SNR).
主要方法:
- 开发一个点接触干超声波传感器.
- 与阵列成像系统的集成.
- 应用总聚焦算法用于信号处理.
主要成果:
- 从混凝土结构中有效采集超声波信号.
- 显著提高了超声波成像的信号噪声比 (SNR).
- 在混凝土中提高了NDT的方便性和可靠性.
结论:
- 拟议的干式传感器克服了传统方法的局限性.
- 这项技术为混凝土中先进的超声波无损试验提供了一条新的途径.
- 它提高了具体结构健康评估的精度和效率.
更多相关视频
07:42Detecting the Water-soluble Chloride Distribution of Cement Paste in a High-precision Way
Published on: November 21, 2017
9.6K
08:40Ultrasonic Welding of Thermoplastic Composite Coupons for Mechanical Characterization of Welded Joints through Single Lap Shear Testing
Published on: February 11, 2016
11.5K
相关概念视频
Non-destructive Tests for Concrete Strength
106
The rebound hammer test, also known as the Schmidt hammer test, is a non-destructive technique for evaluating the hardness of concrete and, indirectly, the strength of concrete. It operates on the principle that the rebound of a spring-driven mass from a concrete surface correlates to the surface's hardness. The device comprises a mass within a tubular housing, a spring mechanism, and a plunger that strikes the concrete. Upon release, the energy imparted to the mass by the spring causes it...
106
Microcracking in Concrete
99
Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
99
Curing of Concrete
88
The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
88
Drying Shrinkage
68
When hardened concrete is exposed to air with a relative humidity of less than 100 percent, it begins to lose the free water within its capillaries. As this water evaporates, the water initially adsorbed onto the calcium silicate hydrates migrates towards these now empty spaces and eventually evaporates as well. Over time, as more water leaves, the volume of the concrete decreases, a phenomenon known as drying shrinkage.
A portion of this drying shrinkage can be reversed; if the concrete is...
A portion of this drying shrinkage can be reversed; if the concrete is...
68
Curing Methods
71
Concrete members with a small surface-to-volume ratio are cured by oiling and moistening the forms before casting the concrete member. These forms can be left in place for a prolonged period to prevent moisture loss, and can be wetted if made of a material suitable for wetting. If the forms are removed early, the concrete member is moistened and covered with polythene sheets to maintain moisture. For large horizontal concrete surfaces exposed to dry weather, a temporary covering is suspended...
71
Testing Water Quality
103
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
103