优化了垂直混合的设计和实验分析,以增强平面改进机器的性能
Jiaxing Du1, Jiyao Hou1, Yuanyuan Dun1
1College of Mechanical Engineering, Jiamusi University, Jiamusi, Heilongjiang, China.
Scientific reports
|January 27, 2025
概括
一台新机器通过整合地下混合和施肥来提高土壤肥沃性,提高了高达18.9%的作物产量. 这项技术解决了Planosols中营养含量低和紧缩的问题,以获得更好的农业生态系统服务.
科学领域:
- 农业工程 农业工程
- 土壤科学 土壤科学
- 农业学是一种农业学.
背景情况:
- 平层土壤经常遭受低肥力,地下压缩和根部穿透不良,阻碍作物生产率和农业生态系统服务.
- 解决这些局限性对于可持续农业和提高作物产量至关重要.
研究的目的:
- 设计和优化一台用于集成地下混合和肥料应用的新型机器.
- 改善土壤肥沃性和根部透在Planosol土壤中.
- 用离散元件方法 (DEM) 模拟和现场试验来评估机器的性能.
主要方法:
- 设计和开发一台整合地下混合和肥料应用的机器,重点是优化垂直混合.
- 离散元件方法 (DEM) 模拟,分析耕地深度,前进速度和高度对土壤混合率和力阻力的影响.
- 实地试验以验证模拟结果并评估土壤改善和作物产量.
主要成果:
- 对垂直混合的优化参数确定为553毫米的耕地深度,1米/秒的前进速度和227毫米的高度.
- 优化的设置实现了7460.5N的阻力和72.1%的土壤混合率.
- 现场试验证实了模拟的准确性,显示地下混合区的产量增加了16.4-18.9%,相比较浅地和地下土壤.
结论:
- 集成的地下混合和施肥机有效地改善了Planosol的土壤条件.
- 从DEM模拟中获得的优化机器参数导致土壤肥沃性和作物产量显著改善.
- 这项技术为增强农业生态系统服务和可持续作物生产提供了可行的解决方案.
相关概念视频
Mixing Concrete
102
Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
102
Design Example: Aggregate Gradation
88
The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
88
Mixing Time
138
The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
138
Design Example: Design of an Irrigation Channel
64
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
64
Design Example: Managing Concrete Workability
70
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
70
Placing Concrete
72
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
72


