一个全面的分析时间投资在滑行道规划的森林访问的滑行道规划
Marc Werder1, Leo Gallus Bont1, Janine Schweier1
1Swiss Federal Institute for Forest, Snow and Landscape Research (WSL), Birmensdorf, Switzerland.
PloS one
|February 4, 2025
概括
适当规划的滑行道对于可持续的木材采伐至关重要. 这项研究模拟了时间和成本,发现规划每公需要3-4小时,每立方米的成本不到1欧元.
科学领域:
- 林业科学 林业科学
- 可持续的森林管理 可持续的森林管理
- 林业运作研究 林业运作研究
背景情况:
- 滑行道显著影响木材采伐的成本效益和环境影响.
- 有效地规划滑行道对于可持续的木材生产至关重要.
- 了解滑行道规划的实际方面对于优化森林运营至关重要.
研究的目的:
- 对滑道规划过程进行经济分析.
- 开发一个初步模型来估计与滑行道规划相关的时间和成本.
- 调查滑道规划的实际执行,时间要求和影响因素.
主要方法:
- 2022年在德国和瑞士的医疗从业者的在线调查.
- 详细调查实际规划过程和影响因素 (例如地形,站场条件,规划方法).
- 时间消耗的统计分析和估计模型的开发.
主要成果:
- 滑行道规划20-40米的距离需要大约3-4小时的每公的生产性工作.
- 相关成本低于每立方米砍伐木材的1欧元.
- 规划时间因特定的森林条件和选择的方法而异.
结论:
- 该研究提供了对滑道规划过程的经济评估.
- 确定了影响规划绩效的因素,允许潜在的合理化和改进.
- 开发的模型有助于估计滑行道规划的时间和成本,支持可持续林业.
相关概念视频
Design Example: Alignment of a Road Line Using GIS
38
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
38
Adjusting a Traverse
47
In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
47
Manipulation and Analysis
18
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
18
Field Procedure for Staking Out Curves
28
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
28
Profile Leveling and Cross Sections
103
Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes. Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
103
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
39
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
39