开发一种新的方法来分析采矿机械的可维护性和停机时间
M Rezaei Dashtaki1, A Jandaghi Jafari1, S H Hoseinie2
1Department of Mining Engineering, Isfahan University of Technology, Isfahan, 84156 83111, Iran.
Scientific reports
|February 6, 2025
概括
这项研究分析了铜矿中绳的维护能力,发现大多数维修时间都在45小时以下. 优化维修流程可以显著提高采矿生产率.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 运营研究 运营研究
背景情况:
- 绳子对于地表采矿的生产率至关重要.
- 提高设备的可靠性和可维护性可以提高运营产出.
研究的目的:
- 在露天铜矿中分析一条绳子车队的可维护性.
- 开发一种定量方法来剖析停机时间的组成.
主要方法:
- 收集和分析了三种模型中的十个绳子的两年维修数据.
- 将可维护性模型应用于单个.
- 将停机时间分为维修前,维修后和维修后的行动.
主要成果:
- 所有的都在45小时内显示出可维护性;80%的维修工作在单班内完成.
- 维修行动占总停机时间的近50%.
- 运输和运营延误约占停机时间的30%.
结论:
- 机队在运营约束范围内表现出可管理的可维护性.
- 停机时间分析揭示了需要改进的关键领域,特别是在物流和修理前后任务方面.
- 这些发现为加强车队的维护策略提供了基础.
相关概念视频
Transmission Shafts: Problem Solving
207
Designing a solid shaft that transmits power from a motor to a machine tool involves a series of calculations to ensure the shaft can withstand the stresses applied by bending moments and torques. First, calculate the torque exerted on the gear, considering the power transmitted by the shaft and its rotational speed. Following this, compute the tangential forces acting on the gears, which directly relate to the torque and the gear radius.
Next, use bending moment diagrams for the shaft to...
Next, use bending moment diagrams for the shaft to...
207
Fatigue
172
Fatigue occurs when materials rupture under repeated or fluctuating loads, even at stress levels far below their static breaking strength. It typically results in brittle failure, even for ductile materials. It is a critical consideration in designing machines and structural components subjected to repetitive or varying loads. The nature of these loadings can range from fluctuating loads like unbalanced pump impellers causing vibrations to repeatedly bending a thin steel rod wire back and forth...
172
Design Consideration
179
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
179
Bearings: Problem Solving
269
Understanding the calculations and concepts related to double-collar bearings is essential for engineers and designers to optimize the performance of these components in various applications. By analyzing the bearing under different conditions, one can ensure that it can withstand the forces and moments experienced during operation. This knowledge enables better decision-making when designing and selecting bearings for specific purposes and configurations. Consider a double-collar bearing with...
269
Design Example: Managing Concrete Workability
69
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
69
Design of Transmission Shafts - Stress Analysis
307
Designing a transmission shaft requires a thorough understanding of the stresses induced by bending moments and torques, especially in systems where power is transferred through gears. These forces create force-couple systems at the centers of the shaft's cross-sections, leading to both transverse and torsional loading. Although shearing stresses from transverse loads are typically smaller than those from torques and are often overlooked, the significant normal stresses from these loads...
307


