相关实验视频
Updated: May 28, 2025

10:09
Operation of the Collaborative Composite Manufacturing CCM System
Published on: October 1, 2019
6.5K
从配置的角度来看,大项目中建筑安全弹性优化路径
1College of Economics and Management, Shandong University of Science and Technology, China.
International journal of occupational safety and ergonomics : JOSE
|February 13, 2025
概括
这项研究揭示了在高原和平原地区的大型项目中不同的安全弹性策略. 高原项目需要增强人力能力和技术,以优化建筑安全.
科学领域:
- 建设管理建设管理.
- 安全工程安全工程
- 弹性理论 弹性理论
背景情况:
- 在大型项目中,施工安全至关重要.
- 现有的框架缺乏安全弹性区域差异化.
- 大型项目在不同的地理环境中面临着独特的挑战.
研究的目的:
- 开发一个完整的框架,用于大型工程中的建筑安全弹性.
- 分析影响因素对安全弹性的影响.
- 为高原和平原大项目确定特定区域的优化路径.
主要方法:
- 弹性理论和系统理论提供了分析基础.
- 使用了定性比较分析 (QCA).
- 对中国高原和平原地区的大型项目进行比较分析.
主要成果:
- 安全弹性的主要驱动因素和优化条件在高原和平原地区之间有所不同.
- 高原大型项目需要更多地强调人力能力和技术支持.
- 特定区域的影响因素对建筑安全弹性产生重大影响.
结论:
- 量身定制的方法对于优化大型工程中的建筑安全弹性至关重要.
- 了解区域差异是有效安全管理的关键.
- 结果为有针对性的安全改进提供了理论和实践基础.
相关概念视频
Design Consideration
177
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
177
Design Example: Alignment of a Road Line Using GIS
37
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
37
Design Example: Managing Concrete Workability
68
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
68
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
39
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
39
Design Example: Sustainability in Concrete Building
153
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
153
Controller Configurations
83
Controller configurations are crucial in a car's cruise control system because they manage speed over time to maintain a consistent pace regardless of road conditions, thereby meeting design goals. In traditional control systems, fixed-configuration design involves predetermined controller placement. System performance modifications are known as compensation.
Control-system compensation involves various configurations, most commonly series or cascade compensation, in which the controller...
Control-system compensation involves various configurations, most commonly series or cascade compensation, in which the controller...
83

