Woliso-Ambo,

Kalkidan Kefale Berta1, Mesfin Tesfaye2

  • 1Department of Management, School of Business and Economics, Ambo University Woliso Campus, Woliso, Ethiopia. kalkidan.kefale@ambou.edu.et.

Scientific reports
|February 13, 2025
PubMed
概括

基础设施项目延迟,特别是道路建设,主要是由于材料成本上升和设备问题. 解决这些因素是改善项目成果和经济增长的关键.

相关概念视频

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
35
Retarders01:19

Retarders

Retarders are chemical admixtures designed to extend the setting time, which is especially useful when there is a delay in sequential concrete pours to prevent cold joints and to achieve a cohesive structure. Retarders, when used in appropriate amounts, can also enhance the architectural appearance of exposed aggregate finishes.
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
61
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
68
Factors Affecting Workability01:24

Factors Affecting Workability

The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
66
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
136
Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
139