在短期电力负载预测中,一个集群分数级灰色模型
Xiang Yu1, Lihua Lu2, Jianming Qi3
1School of Electronics and Information, Shanghai Dianji University, Shuihua Road, Shanghai, 201306, China. yux@sdju.edu.cn.
Scientific reports
|February 20, 2025
概括
一个新的集群分数顺序通用预测控制 (C-FGM) 模型改善了短期电荷预测. 这种数据驱动的方法与现有方法相比,提高了能源需求管理的准确性.
科学领域:
- 电气工程 电气工程
- 数据科学数据科学数据科学
- 应用数学 应用数学 应用数学
背景情况:
- 准确的短期电力负载预测对于能源需求管理至关重要.
- 电力消耗数据表现出非静止,非线性和多维的特征,这给预测带来了挑战.
- 分数级偏微分方程在建模复杂的电力消耗行为方面表现有前途.
研究的目的:
- 引入一种新的集群分数顺序通用预测控制 (C-FGM) 模型,用于短期电荷预测.
- 利用分数式微积分和聚类来提高电力系统的预测准确性.
主要方法:
- 开发了C-FGM模型,结合参数α来捕捉集群子系列中的累积天气趋势.
- 利用分数级部分微分方程来建模历史的数序列,在全球范围内优化超参数.
- 在两个真实世界的电力数据集上验证了模型.
主要成果:
- C-FGM模型有效地从数据集中直接学习超参数,以便准确预测.
- 与LSTM (MAPE1.97-4.67%与4.34%) 和变压器 (5.42%) 相比,实现了更高的精度.
- 在平均绝对百分比误差 (MAPE) 中显著改善.
结论:
- C-FGM模型为短期电荷预测提供了强大而准确的解决方案.
- 这种数据驱动的方法为实时能源需求管理提供了有效的工具.
- 分数顺序建模与集群结合,增强了复杂电力系统的预测能力.
相关概念视频
Fast Decoupled and DC Powerflow
152
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
152
Multimachine Stability
130
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
130
Load-frequency control
116
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
116
The Delta-to-Delta Circuit
525
In a delta-delta configuration, the source and the load are connected in a delta manner, forming a closed loop that divides the network into three distinct phases. This configuration makes the phase voltages identical to line voltages. Assuming the sources are in positive sequence, the phase voltages can be expressed directly without having a neutral wire.
525
Power System Three-Phase Short Circuits
72
Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
72
Three-Phase Short Circuit—Unloaded Synchronous Machine
110
Conducting a three-phase short circuit test on an unloaded synchronous machine helps understand its impact on the system. The AC fault current's oscillogram, with the DC offset removed, reveals that the waveform amplitude decreases from an initially high value to a steady-state level for one phase of the machine.
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
110