空中交通管制中的主观和客观疲劳动力学
Maximilian Peukert1, Lea Claus2, Lothar Meyer1
1Air Navigation Services of Sweden (LFV), Sweden.
Industrial health
|February 24, 2025
概括
空中交通管制员经历了显著的疲劳,特别是在夜班,由于昼夜节律和睡眠减少. 需要有针对性的策略来管理空中交通管制 (ATC) 轮班工作中的疲劳.
科学领域:
- 人类因素 人类因素
- 职业健康 职业健康 职业健康
- 航空航天医学 航空航天医学
背景情况:
- 疲劳是空中交通管制 (ATC) 的持续挑战,与轮班工作有关.
- 在区域控制中心 (ACC) 的不同班次中,特定的疲劳模式尚不清楚.
研究的目的:
- 在ACC中调查早上,晚上和夜班期间的睡眠持续时间和疲劳进展.
- 分析昼夜节律对ATC人员疲劳的影响.
主要方法:
- 采取了客观的 (精神运动警觉任务,PVT-B) 和主观的 (斯坦福睡眠度量表,SSS) 疲劳措施.
- 数据是在每种轮班类型的开始,中间和结束时收集的.
主要成果:
- 夜班的工作人员有最短的班前睡眠时间,增加了睡眠压力.
- 主观疲劳在晚班增加;夜班在昼夜低 (WOCL) 窗口期间显示了峰值疲劳.
- 目标表现在中班下降,夜班的恢复有限.
结论:
- 昼夜节律显著影响ATC的疲劳动力学,特别是在夜班.
- 与日班相比,夜班会导致更高的疲劳水平.
- 缓解策略必须解决ATC的昼夜脆弱性和不规则的睡眠模式.
相关概念视频
Fatigue
171
Fatigue occurs when materials rupture under repeated or fluctuating loads, even at stress levels far below their static breaking strength. It typically results in brittle failure, even for ductile materials. It is a critical consideration in designing machines and structural components subjected to repetitive or varying loads. The nature of these loadings can range from fluctuating loads like unbalanced pump impellers causing vibrations to repeatedly bending a thin steel rod wire back and forth...
171
Muscle Recovery and Fatigue
1.9K
Muscle fatigue refers to the decline in a muscle's ability to maintain the force of contraction after prolonged activity. It primarily stems from changes within muscle fibers. Even before experiencing muscle fatigue, one may feel tired and have the urge to stop the activity. This response, known as central fatigue, occurs due to changes in the central nervous system, namely the brain and spinal cord. While there is no single mechanism that induces fatigue, it may serve as a protective...
1.9K
Control Systems
1.0K
Control systems are everywhere in contemporary society, influencing diverse applications from aerospace to automated manufacturing. These systems can be found naturally within biological processes, such as blood sugar regulation and heart rate adjustment in response to stress, as well as in man-made systems like elevators and automated vehicles. A control system is essentially a network of subsystems and processes that collaboratively convert specific inputs into desired outputs.
At the heart...
At the heart...
1.0K
Fatigue Strength of Concrete
159
Fatigue, in the context of materials science and engineering, refers to the weakening or failure of a material caused by repeatedly applied loads, even if these loads are below the strength limit of the material. Fatigue strength in concrete is a critical property that influences its durability and longevity. Concrete can fail in two ways due to fatigue. Static fatigue or creep rupture occurs under a constant load or one that increases slowly. The other failure mode is due to cyclical or...
159
Assessment of the Cardiovascular System I: Subjective Data
261
A thorough health history and physical assessment are essential for identifying cardiovascular disease (CVD) symptoms and distinguishing them from other health issues.
Initial Enquiry
Ask the patient about their primary concern and thoroughly explore all reported symptoms.
Medical History
Investigate past illnesses affecting the cardiovascular system, such as angina, anemia, rheumatic fever, congenital heart disease, stroke, thrombophlebitis, dysrhythmias, varicosities
Inquire about symptoms...
Initial Enquiry
Ask the patient about their primary concern and thoroughly explore all reported symptoms.
Medical History
Investigate past illnesses affecting the cardiovascular system, such as angina, anemia, rheumatic fever, congenital heart disease, stroke, thrombophlebitis, dysrhythmias, varicosities
Inquire about symptoms...
261
Load-frequency control
116
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
116


