在肯尼亚和贝宁,不确定的参数和结构制定对于电力系统规划的相对重要性
Nandi Moksnes1, William Usher1
1Department of Energy Technology, KTH Royal Institute of Technology Stockholm, Brinellv. 68, Stockholm, Sweden.
iScience
|February 25, 2025
概括
在撒哈拉以南非洲地区建模电力接入需要仔细考虑空间和时间分辨率. 这些因素,以及能源需求和折扣率,对肯尼亚和贝宁等国家的结果产生了重大影响.
科学领域:
- 能源系统建模 能源系统建模
- 非洲能源获取非洲能源获取
- 计算可持续性的计算可持续性
背景情况:
- 撒哈拉以南非洲地区在获得电力方面面临挑战,肯尼亚为71%和贝宁为42% (2020年).
- 该地区的能源建模因有限的计算资源,数据稀缺和动态能源系统而复杂.
- 路径依赖的建模决策和参数不确定性是关键因素.
研究的目的:
- 探讨撒哈拉以南非洲地区获得电力的研究中建模决策和不确定性的相对重要性.
- 为肯尼亚和贝宁等国家确定影响能源系统模型结果的关键因素.
- 为各种能源环境提供有关适当模型设置的指导.
主要方法:
- 利用全球灵敏度分析来评估各种参数的影响.
- 研究了空间和时间分辨率在能源系统模型中的影响.
- 在不同的国家背景 (肯尼亚和贝宁) 中比较建模结果.
主要成果:
- 电力需求,折扣率和时间/空间分辨率显著影响模型结果.
- 模型的结果在不同国家之间有很大差异,突出了需要特定环境的参数化.
- 空间和时间分辨率对于建模电网扩张至关重要.
结论:
- 能源系统建模人员必须选择适合特定国家环境的适当的空间和技术参数.
- 可定制的空间和时间分辨率是必不可少的,即使在网络扩展建模的场景之间也可以适应.
- 模型设置灵活性是准确评估撒哈拉以南非洲电力接入通道的关键.
相关概念视频
Distribution Reliability and Automation
103
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
103
The Power Flow Problem and Solution
157
Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk, phase angle δk, real power Pk, and reactive power Qk. Two of these four variables are inputs, while the...
157
Multimachine Stability
130
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
130
Three-Phase Circuits
383
AC power distribution systems have three categories: single-phase, two-phase, and three-phase systems. The single-phase circuit, common in residential settings, typically employs a two-wire system connecting a single AC source to various loads. These circuits support standard household appliances operating at 120 volts (V) and 240 V, such as lamps, televisions, and microwaves. The first generators, Niagara Falls hydro plant installed in 1895, were two-phase and designed by Nikola Tesla. The...
383
Power System Three-Phase Short Circuits
72
Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
72
Maximum Power Flow and Line Loadability
92
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
92