概括
这项研究纠正了先前发表的一篇文章DOI. 校正确保了科学文献的准确引用和引用. 研究人员应在所有未来的引用中使用更新的DOI.
科学领域:
- 科学出版业的科学出版.
- 图书统计学 图书统计学
- 学术传播学术交流
背景情况:
- 准确的引用对于科学完整性至关重要.
- DOI (数字物体标识符) 系统确保持续链接到学术文章.
- 在DOI中的错误可能会阻碍研究的可复制性和影响跟踪.
研究的目的:
- 纠正一个错误的数字物体标识符 (DOI) 发表的文章.
- 确保科学工作的准确引用和可发现性.
- 维护科学记录的完整性.
主要方法:
- 在原始出版物中错误的DOI的识别.
- 通过官方注册道验证正确的DOI.
- 发布纠正通知以更新文章的元数据.
主要成果:
- 错误的DOI已被确定并纠正.
- 修正后的DOI现在与预期的产品相关联.
- 这样可以确保正确的归因和对研究的准入.
结论:
- 对DOI的纠正符合学术出版的标准.
- 准确的元数据对于科学研究的传播和影响至关重要.
- 建议研究人员在未来的所有引用中使用更新的DOI.
相关概念视频
Design Example: Alignment of a Road Line Using GIS
25
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
25
Friction: Problem Solving
191
Friction is an essential force that influences the motion of objects in daily life. Depending on the situation, it can be either beneficial or problematic. Consider a bus with a mass of three megagrams and its center of mass at a specific point, moving along a banked road at a constant speed. The coefficient of static friction between the tires and the road is 0.5. Find the maximum angle of the banked road at which the bus would not slip or tip.
Initially, a visual representation of the...
Initially, a visual representation of the...
191
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
34
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
34
The Anchoring-and-Adjustment Heuristic
7.2K
In order to make good decisions, we use our knowledge and our reasoning. Often, this knowledge and reasoning is sound and solid. However, sometimes, we are swayed by biases or by others manipulating a situation. For example, let’s say you and three friends wanted to rent a house and had a combined target budget of $1,600. The realtor shows you only very run-down houses for $1,600 and then shows you a very nice house for $2,000. Might you ask each person to pay more in rent to get the...
7.2K
Design Consideration
172
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
172


