长墙面板宽度设计,预测相应的最大诱导地面表面沉降
Fariborz Matinpour1, Abbas Majdi2
1School of Mining Engineering, College of Engineering, University of Tehran, Tehran, 1439957131, Iran.
Scientific reports
|April 9, 2025
概括
新的分析方法准确地估计了长墙采矿造成的地面沉降. 这些方法有助于设计最佳的长壁面板宽度,考虑煤层厚度和膨胀因素等因素.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 地球科学 地球科学 地球科学
背景情况:
- 长墙采矿是一种普遍的地下煤炭开采技术.
- 前进的煤层会造成屋顶断层,这些断层会扩散到表面,可能导致地面沉降.
- 沉降受到粗材料的膨胀因子的影响.
研究的目的:
- 提出一个新的方程,用于初始的断裂膨胀因子.
- 开发长墙面板宽度设计的分析方法.
- 预测最大诱导的地面表面沉降.
主要方法:
- 开发了一个新的初始断裂膨胀因子的方程.
- 介绍了用于面板宽度设计和沉降预测的两种新分析方法.
- 对关键参数进行了敏感性分析.
- 将拟议的方法与现有方法进行比较,并通过现场测量进行验证.
主要成果:
- 提出的方法可靠地估计了最大诱导的地面表面沉降.
- 灵敏度分析评估了一些参数的影响,如煤层厚度,覆盖深度,拉动角度和膨胀因素.
- 使用现场数据的验证证实了各种面板宽度的准确性.
结论:
- 开发的分析方法为设计长墙面板宽度提供了可靠的方法.
- 这些方法准确地预测了长壁采矿操作引起的地面表面沉降的最大值.
相关概念视频
Design Example: Maintaining Level of an Embankment
42
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
42
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
31
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
31
Design Example: Dimensioning of Concrete Masonry Construction
78
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
78
Maximum Deflection
417
When analyzing beams under unsymmetrical loads, such as a train moving on a bridge, it is crucial to accurately determine the points of maximum stress and deflection. The process involves identifying the maximum deflection of the beam, which may not always occur at its midpoint due to the uneven distribution of the load.
The maximum deflection occurs at a specific point, known as point O, where the tangent to the deflection curve is horizontal. To find point O, the slope of the tangent at any...
The maximum deflection occurs at a specific point, known as point O, where the tangent to the deflection curve is horizontal. To find point O, the slope of the tangent at any...
417
Unsymmetric Loading of Thin-Walled Members: Problem Solving
84
The shear center of a channel section with uniform thickness, height, and width, is determined by computing the shear force in the member and calculating the moments of inertia of the sections.
To compute the shear forces, find the shear flow at a specific distance from the endpoint using the vertical shear and the moment of inertia values. The total shear force on the flange is calculated by integrating the shear flow from one end of the flange to the other.
Next, calculate the moments of...
To compute the shear forces, find the shear flow at a specific distance from the endpoint using the vertical shear and the moment of inertia values. The total shear force on the flange is calculated by integrating the shear flow from one end of the flange to the other.
Next, calculate the moments of...
84
Design Example: Managing Concrete Workability
65
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
65


