基于煤层地质条件的最佳爆破参数优化和碎片化控制的研究
Zhouquan Liao1, Xiaohua Ding2, Mingzhi Liang3
1School of Mines, China University of Mining and Technology, Xuzhou, 221116, China.
Scientific reports
|April 10, 2025
概括
优化开放式煤矿爆炸方案可显著减少碎煤,增加有价值的块煤. 这项研究提高了效率,并通过改进喷气参数来降低生产停机时间.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 岩石爆炸技术的技术.
- 数字模拟 数字模拟
背景情况:
- 穿孔爆炸是开放式煤矿开采的主要成本之一.
- 块煤价格高于粉碎煤,因此减少罚款至关重要.
- 开发适合不同地质条件的有效爆破方案是关键的研究领域.
研究的目的:
- 为了优化开放式煤矿爆炸计划.
- 为了减少粉碎煤的比例,增加一次性煤炭产量.
- 提高整体采矿效率,减少运营停机时间.
主要方法:
- 使用LS-DYNA软件与流体-固体合算法进行数值模拟.
- 分析参数,包括电荷结构,爆炸物类型,中间介质和孔间距.
- 实地测试以验证优化的喷气方案.
主要成果:
- 确定了一个使用特定电荷和孔间距离的低密度爆炸物的优化方案.
- 罚款率下降了5.93% (从30.10%降至24.17%).
- 断层煤的比例增加了9.08% (从59.33%增加到68.41%),而大型断层煤则减少了3.15%.
结论:
- 优化的喷气方案有效地减少了罚款和大块,提高了煤炭质量.
- 这项研究提供了理论指导和实际支持,用于在软煤层中进行爆炸.
- 这些发现表明,开采采矿具有重要的工程价值和广泛的应用前景.
相关概念视频
Quarrying of Stone
77
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
77
Compacting Factor test
98
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
98