M K Soundarya1, A Logeshkumaran2, P R Kalyana Chakravarthy3

  • 1Department of Civil Engineering, Vels Institute of Science, Technology and Advanced Studies, Chennai, India. mk.soundaryaa@gmail.com.

Scientific reports
|April 12, 2025
PubMed
概括

印度的建设项目延误严重影响经济发展和利能力. 这项研究确定并排列了超支的12个主要原因,为利益相关者提供了减轻这些问题的见解.

相关概念视频

Shrinkage in Concrete01:27

Shrinkage in Concrete

Shrinkage in concrete is primarily due to water loss from evaporation, hydration of cement, or carbonation, leading to a reduction in volume. The volumetric contraction results in volumetric strain in concrete. However, in practice, shrinkage is measured as linear strain, which is one-third of the volumetric strain.
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
61
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
144
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
24
Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
398
The Anchoring-and-Adjustment Heuristic01:25

The Anchoring-and-Adjustment Heuristic

In order to make good decisions, we use our knowledge and our reasoning. Often, this knowledge and reasoning is sound and solid. However, sometimes, we are swayed by biases or by others manipulating a situation. For example, let’s say you and three friends wanted to rent a house and had a combined target budget of $1,600. The realtor shows you only very run-down houses for $1,600 and then shows you a very nice house for $2,000. Might you ask each person to pay more in rent to get the...
7.2K
Design Example: Designing a Residential Plumbing System01:25

Design Example: Designing a Residential Plumbing System

The design of residential plumbing systems requires carefully evaluating water demand, flow rates, and pressure dynamics to ensure both efficiency and reliability. The nature of water flow within pipes is defined by its Reynolds number, which classifies flow as either laminar (smooth) or turbulent.
160