基于CCER方法的"源 - 网 - 负载 - 存储"项目的最佳调度和碳收入分配策略的研究
Xudong Li1, Zhongfu Tan1, Junyao Shen1
1North China Electric Power University, Beijing, 102206, China.
Journal of environmental management
|April 17, 2025
概括
本研究介绍了中国认证减排 (CCER) 方法论,用于集成的"源电网负载存储" (SGLS) 项目,证明了显著的碳排放减少和成本节约. 这种方法优化了公园的运营,通过多个实体的合作增强了经济和环境效益.
科学领域:
- 能源系统工程 能源系统工程
- 环境经济学环境经济学
- 气候变化缓解缓解 气候变化缓解
背景情况:
- 中国自愿减少温室气体排放的市场正在发展.
- 集成的"源电网-负载存储" (SGLS) 项目提供了减少排放的潜力.
- 现有的方法可能无法完全捕捉SGLS项目收益.
研究的目的:
- 为SGLS项目开发一个中国认证减排 (CCER) 方法.
- 评估SGLS项目的碳排放减少和经济效益.
- 优化SGLS项目计划,以降低成本和减少排放.
主要方法:
- 建立了用于排放计算的基线和项目场景.
- 开发了一个调度模型,尽量减少成本和碳排放.
- 研究了在利益相关者之间减少碳排放收入的分配.
主要成果:
- 拟议的CCER方法为SGLS项目提供了一个可行的途径.
- 年碳排放总量减少了28583.78.
- 每年电力成本减少了9.73.2亿日元,CCER收入增加了1.948亿日元.
结论:
- CCER方法提高了SGLS项目的经济和环境绩效.
- 电力,负载和储能实体之间的合作对于最大化效益至关重要.
- 这项研究为SGLS项目中CCER方法开发和碳效益分配提供了一个参考.
相关概念视频
Load-frequency control
93
Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
93
Fast Decoupled and DC Powerflow
128
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
128
The Power Flow Problem and Solution
135
Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk, phase angle δk, real power Pk, and reactive power Qk. Two of these four variables are inputs, while the...
135
Maximum Power Flow and Line Loadability
87
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
87
Design Example: Alignment of a Road Line Using GIS
21
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
21
Control of Power Flow
242
There are several methods to control power flow in power systems:
242