路径思维:用于路径扰乱分析的创新工具和数据库,揭示药物和向蛋白质集的关键路径

Om Prakash Sharma1

  • 1Partex N.V, Frankfurter Str. 27, Eschborn, 65760, Germany.

概括

我们介绍了PathwayMind,这是一种基于图形的新方法,用于路径丰富分析. 该工具使用拓信息优先考虑生物途径,为药物机制和疾病途径提供更深入的见解.

相关概念视频

Pedigree Analysis01:35

Pedigree Analysis

Overview
91.3K
Epistasis Analysis01:09

Epistasis Analysis

Although Mendel chose seven unrelated traits in peas to study gene segregation, most traits involve multiple gene interactions that create a spectrum of phenotypes. When the interaction of various genes or alleles at different locations influences a phenotype, this is called epistasis. Epistasis often involves one gene masking or interfering with the expression of another (antagonistic epistasis). Epistasis often occurs when different genes are part of the same biochemical pathway. The...
6.3K
Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
8.0K
IP3/DAG Signaling Pathway01:11

IP3/DAG Signaling Pathway

Membrane lipids such as phosphatidylinositol (PI) are precursors for several membrane-bound and soluble second messengers. Specific kinases phosphorylate PI and produce phosphorylated inositol phospholipids. One such inositol phospholipids are the  phosphatidylinositol-4,5 bisphosphate [PI(4,5)P2], present in the inner half of the lipid bilayer. Upon ligand binding, GPCR stimulates Gq proteins to turn on phospholipase Cꞵ. Activated phospholipase Cꞵ cleaves PI(4,5)P2 and...
16.0K