穿西

Michael J Feldman1, Gerald E Pruden2, Joshua Petteway3

  • 1Virginia Commonwealth University, Division of Plastic and Reconstructive Surgery, Richmond, VA, USA.

概括

消防员内衣在闪过事件中显著影响着烧伤风险. 合成材料可能会增加烧伤严重程度,强调需要进一步研究保护基层,以提高消防员安全.

相关概念视频

PPE Use in Healthcare Settings I: Donning01:22

PPE Use in Healthcare Settings I: Donning

Donning PPE must be completed before contact with the patient. This process protects from infectious agents. The sequence and action included in each donning are critical, and the steps must be systematic to avoid exposure to pathogens. The institutional policy also needs to be followed while donning PPE. The pre-donning preparations are gathering equipment, inspecting the PPE equipment for tears, holes, or damage, removing jewelry, removing any garments below the elbows, and tying the hair...
903
Personal Protective Equipment01:20

Personal Protective Equipment

Personal protective equipment (PPE) is unique clothing or equipment worn by an employee to minimize or prevent exposure to infectious agents. PPE creates a barrier between the employee and the infectious materials. PPE must be readily available in the patient care area. PPE includes gloves, gowns and aprons, masks and respirators, goggles, face shields, shoes, and headcovers:
1.5K
PPE Use in Healthcare Settings II: Doffing01:10

PPE Use in Healthcare Settings II: Doffing

The sequence of removing or doffing PPE starts with the gloves, as they are the most contaminated. Next is removal of the face shield or goggles, as they would interfere with removing other PPE. Then remove the gown, followed by the mask or respirator. Perform hand hygiene between steps if hands become contaminated and immediately after removing all PPE. Generally, the outside front and sleeves of the isolation gown, the goggles or the mask, the respirator, and the face shield are contaminated.
864
Masonry in Cold and Hot Weather Conditions01:21

Masonry in Cold and Hot Weather Conditions

In cold weather, masonry construction requires specific precautions to ensure mortar does not freeze before curing, as this can significantly weaken its strength and watertightness. Mortar temperature should be maintained between 60°F and 80°F to support proper hydration and curing. Below 40°F, mortar water must be heated, but should not exceed 120°F as high temperatures can reduce mortar's compressive and bond strength.
Other key practices include keeping masonry units...
64
Collar Bearings01:23

Collar Bearings

Collar bearings are essential in various machines designed to support axial loads on rotating shafts. Depending on the specific application and requirements, they can be found with single or multiple collars.
1.2K
Factors Affecting Body Temperature01:28

Factors Affecting Body Temperature

As a nurse, it is vital to understand the factors affecting body temperature to monitor variations and effectively evaluate deviations from regular.
Factors may  include:
3.5K