.

Hang Zhou1, Chengyuan Ma1, Ke Ma1

  • 1Department of Civil and Environmental Engineering, University of Wisconsin-Madison, United States of America.

概括

本研究引入了一种新的基于量子的方法,用于自动驾驶汽车 (AV) 安全评估. 它通过生成风险变化的场景和减少测试时间,有效地评估AV安全性.

相关概念视频

Finding Critical Values for Chi-Square01:18

Finding Critical Values for Chi-Square

Consider a curve representing sample data drawn randomly from a normally distributed population. One must construct confidence intervals to estimate or to test a claim regarding the population standard deviation. For example, a 95% confidence interval covers 95% of the area under the curve, and the remaining 5% is equally distributed on either side of the curve. To achieve such confidence intervals, one must determine the critical values. The critical values are simply the values separating the...
2.8K
Unusual Results01:16

Unusual Results

Unusual results are those that have a very low chance of occurring. Unusual results can be identified using probabilities and the range rule of thumb. In problems involving probability, unusual results can be observed in 2 instances – an unusually high number of successes or an unusually low number of successes.
According to the range rule of thumb, any value above or below two standard deviations, 2σ  from the mean, μ  is considered unusual.
Maximum unusual value =...
3.1K
Determination of Expected Frequency01:08

Determination of Expected Frequency

Suppose one wants to test independence between the two variables of a contingency table. The values in the table constitute the observed frequencies of the dataset. But how does one determine the expected frequency of the dataset? One of the important assumptions is that the two variables are independent, which means the variables do not influence each other. For independent variables, the statistical probability of any event involving both variables is calculated by multiplying the individual...
2.1K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
26
Probability Histograms01:17

Probability Histograms

A probability histogram is a visual representation of a probability distribution. Similar a typical histogram, the probability histogram consists of contiguous (adjoining) boxes. It has both a horizontal axis and a vertical axis. The horizontal axis is labeled with what the data represents. The vertical axis is labeled with probability. Each rectangular bar in the histogram is 1 unit wide, which suggests that the area under each bar equals the probability, P(x), where x is 1, 2, 3, and so on.
10.9K
Distribution Reliability and Automation01:25

Distribution Reliability and Automation

Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
90